Hummer H2. Manual — part 1173
Fig. 26: Positive Battery Cable
Courtesy of GENERAL MOTORS CORP.
1. Install the generator cable (2) to the junction block.
2. Install the generator cable nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
NOTE:
Refer to Fastener Notice in Cautions and Notices.
2004 Hummer H2
2004 ELECTRICAL Engine Electrical - Hummer H2
3. Close the positive cable junction block.
Fig. 27: View Of Generator Cable & Nut
Courtesy of GENERAL MOTORS CORP.
4. Install the generator cable to the generator, perform the following:
1. Install the generator cable to the stud.
2. Install the generator cable nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
3. Position the boot to cover the stud.
2004 Hummer H2
2004 ELECTRICAL Engine Electrical - Hummer H2
Fig. 28: Battery Ground Negative Cable & Bolt
Courtesy of GENERAL MOTORS CORP.
5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure
(Single Battery) .
BATTERY REPLACEMENT
Removal Procedure
CAUTION: Refer to Battery Disconnect Caution in Cautions and Notices.
2004 Hummer H2
2004 ELECTRICAL Engine Electrical - Hummer H2
Fig. 29: Battery Ground Negative Cable & Bolt
Courtesy of GENERAL MOTORS CORP.
1. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure
(Single Battery) .
2. Disconnect the positive battery cable.
2004 Hummer H2
2004 ELECTRICAL Engine Electrical - Hummer H2
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст