Hummer H2. Manual — part 1767

z

Electronic variable orifice switch (2)

46. Position the harness ground and negative battery cable to the block.

47. Install the harness ground bolt.

Tighten: Tighten the harness ground bolt to 25 N.m (18 lb ft).

Fig. 259: MAP Sensor & Knock Sensor Electrical Connectors
Courtesy of GENERAL MOTORS CORP.

48. Connect the MAP sensor (1) and knock sensor (2) electrical connectors.

2004 Hummer H2

2004 ENGINE Engine Mechanical - 4.8L, 5.3L, and 6.0L - Hummer H2

Fig. 260: Throttle Body Electrical Connector
Courtesy of GENERAL MOTORS CORP.

49. Connect the ETC connector (1).

2004 Hummer H2

2004 ENGINE Engine Mechanical - 4.8L, 5.3L, and 6.0L - Hummer H2

Fig. 261: Harness Clips, Main Coil Harness, Fuel injectors & (EGR) Valve Electrical Connectors
Courtesy of GENERAL MOTORS CORP.

50. Connect the following electrical connectors:

z

Main coil harness (1)

z

Fuel injectors (3)

z

EGR valve (4)

2004 Hummer H2

2004 ENGINE Engine Mechanical - 4.8L, 5.3L, and 6.0L - Hummer H2

Fig. 262: Harness Clips, Main Coil Harness & Fuel Injector Electrical Connectors
Courtesy of GENERAL MOTORS CORP.

51. Connect the main coil harness (2) and fuel injector (3) electrical connectors on the left side.

2004 Hummer H2

2004 ENGINE Engine Mechanical - 4.8L, 5.3L, and 6.0L - Hummer H2

Была ли эта страница вам полезна?
Да!Нет
8 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности