Toyota Tundra. Manual — part 1835
Fig. 412: Identifying Bolt Length
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c
Install a new O-ring to the oil pump
Fig. 413: Locating Oil Pump O-Ring
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
d
Apply seal packing in a continuous line as shown below
Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Standard seal diameter: 3 to 4 mm (0.118 to 0.157 in.)
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (1GR-FE) - Tundra
Fig. 414: Identifying Seal Packing Applying Area
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
e
Install the oil pan with the 17 bolts and 2 nuts Tighten the bolts and nuts uniformly in several
steps
Torque: for bolt A, B and nut
21 N*m (214 kgf*cm, 15 ft.*lbf)
for bolt C
10 N*m (102 kgf*cm, 7 ft.*lbf)
Bolt length
BOLT LENGTH SPECIFICATION
NOTE:
Remove any oil from the contact surface.
Install the oil pan within 3 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing.
Item Quantity
Length
A
6
25 mm (0 984 in )
B
9
45 mm (1 77 in )
C
2
14 mm (0 551 in )
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (1GR-FE) - Tundra
Fig. 415: Identifying Bolts & Nuts Tightening Sequence
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
27
INSTALL OIL STRAINER SUB-ASSEMBLY
a
Install a new gasket and the oil strainer with the 2 nuts
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
Fig. 416: Identifying Oil Strainer With Nuts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
28
INSTALL NO. 2 OIL PAN SUB-ASSEMBLY (See INSTALLATION )
29
INSTALL OIL PAN DRAIN PLUG
a
Install the drain plug and a new gasket
Torque: 40 N*m (408 kgf*cm, 30 ft.*lbf)
30
INSTALL CRANKSHAFT PULLEY
a
Using SST, install the pulley set bolt
SST 09213-54015 (91651-60855), 09330-00021
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (1GR-FE) - Tundra
Torque: 250 N*m (2549 kgf*cm, 184 ft.*lbf)
Fig. 417: Using SST To Install Pulley Set Bolt
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
31
SET NO. 1 CYLINDER TO TDC/COMPRESSION (See ADJUSTMENT )
32
INSPECT VALVE CLEARANCE (See ADJUSTMENT )
33
ADJUST VALVE CLEARANCE (See ADJUSTMENT )
34
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH
a
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces
of the cylinder head, timing chain cover and cylinder head cover
b
Apply seal packing as shown below
Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Standard seal diameter: 2 to 3 mm (0.0787 to 0.118 in.)
NOTE:
Remove any oil from the contact surface.
Install the head cover within 3 minutes after applying seal
packing.
Fig. 418: Identifying Seal Packing Applying Area
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
Do not start the engine for at least 2 hours after the installation.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (1GR-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст