Toyota Tundra. Manual — part 1767
Fig. 87: Disconnecting Air Inlet Line Hose
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
3
Pull out the hose
e
Disconnect the vent line hose
1
Pinch the retainer and then raise it
f
Disconnect the wire harness clamp
NOTE:
Do not use any tools in this procedure.
Check for any dirt and foreign matter contamination in the
canister and around the hose. Clean if necessary. Foreign
matter may damage the O-rings or cause leaks in the seal
between the canister and hose.
NOTE:
Do not use any tools in this procedure.
Check for any dirt and foreign matter contamination in the
valve and around the connector. Clean if necessary.
Foreign matter may damage the O-rings or cause leaks in
the seal between the valve and connector.
2009 Toyota Tundra
2009 ENG NE Emission Control (3UR-FE) - Tundra
Fig. 88: Identifying Wire Harness Clamp
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
g
Remove the 4 bolts and canister
Fig. 89: Identifying Canister Bolts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
INSPECTION
1
INSPECT CANISTER ASSEMBLY
a
Visually check the canister for cracks or damage If cracks or damage are found, replace the
canister assembly
Fig. 90: Checking Canister For Cracks And Damage
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENG NE Emission Control (3UR-FE) - Tundra
b
Check for the canister operation
1
With the purge port closed, blow 2 kPa (20 gf/cm
2
, 0 3 psi) of air into the vent port, and
check that air flows from the air inlet port
If the result is not as specified, replace the canister assembly
Fig. 91: Checking Canister Operation
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2
With the vent port closed, blow 1 kPa (10 gf/cm
2
, 0 2 psi) of air inlet port, and check that air
flows from the purge port
If the result is not as specified, replace the canister assembly
Fig. 92: Checking Air Flows From Purge Port
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c
Check for air leak
1
Remove the air hose between ports A and B
2
Connect the pressure gauge to the vent port of the canister
2009 Toyota Tundra
2009 ENG NE Emission Control (3UR-FE) - Tundra
Fig. 93: Connecting Pressure Gauge To Vent Port Of Canister
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
3
With port B, purge port and the air inlet port closed and port A open, apply 20 kPa (0 2
kgf/cm
2
, 2 9 psi) of pressurized air into the vent port, then confirm that pressure is retained
for 1 minute
If the result is not as specified, replace the canister assembly
d
Check the leak detection pump
1
Remove the detection pump from the canister
2
Check that air flows from port A to B and then to C
If the result is not as specified, replace the canister assembly
Fig. 94: Checking Air Flow From Port A To B & Then To C
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENG NE Emission Control (3UR-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст