Toyota Tundra. Manual — part 1087
Fig. 7: Identifying Generator Components With Torque Specifications (1 Of 2)
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ELECTRICAL Charging (3UR-FBE) - Tundra
Fig. 8: Identifying Generator Components With Torque Specifications (2 Of 2)
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
REMOVAL
1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTE:
2009 Toyota Tundra
2009 ELECTRICAL Charging (3UR-FBE) - Tundra
2. REMOVE V-BANK COVER (See REMOVAL )
3. REMOVE AIR CLEANER HOSE ASSEMBLY (See REMOVAL )
4. REMOVE AIR CLEANER ASSEMBLY (See REMOVAL )
5. REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY (See REPLACEMENT )
6. REMOVE FAN AND GENERATOR V BELT (See REMOVAL )
7. REMOVE FRONT FENDER APRON SEAL RH
a. Remove the 5 clips and apron seal.
8. DISCONNECT VANE PUMP ASSEMBLY (See REMOVAL )
9. REMOVE GENERATOR ASSEMBLY
a. Disconnect the generator connector.
b. Remove the terminal cap and nut, and disconnect the generator wire.
Fig. 9: Locating Generator Connector, Wire And Cap Nut
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c. Remove the bolt and disconnect the wire harness bracket from the generator.
d. Remove the 3 bolts, nut and generator.
When disconnecting the cable, some systems need to be initialized
after the cable is reconnected (See INITIALIZATION )
After the ignition switch is turned off, the navigation system requires
approximately 90 seconds to record various types of memory and
settings. As a result, after turning the ignition switch off, wait 90
seconds or more before disconnecting the cable from the negative (-)
battery terminal.
2009 Toyota Tundra
2009 ELECTRICAL Charging (3UR-FBE) - Tundra
Fig. 10: Locating Generator Bolts And Nuts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
DISASSEMBLY
1. REMOVE GENERATOR PULLEY
SST 09820-63011 (09820-06010, 09820-06021)
HINT:
SST REFERENCE CHART
a. Clamp the generator housing stay in a vise.
b. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf)
Fig. 11: Tightening SST 1-B Clockwise
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c. Insert SST 2, and attach the pulley nut to SST 2.
SST 1-A and B 09820-06010
SST 2
09820-06021
NOTE:
Check that SST is secured on the rotor shaft.
2009 Toyota Tundra
2009 ELECTRICAL Charging (3UR-FBE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст