Toyota Sequoia (2005). Manual — part 697
B17469
SF0P7–16
B17470
–
SFI
THROTTLE BODY
SF–43
2777
INSTALLATION
1.
INSTALL THROTTLE BODY
(a)
Install the throttle body with the nut and 3 bolts.
Torque: 14 N·m (143 kgf·cm, 10 ft·lbf)
(b)
Connect the 2 water bypass hoses to the throttle body.
(c)
Connect the throttle control connector.
2.
INSTALL INTAKE AIR CONNECTOR
3.
FILL WITH ENGINE COOLANT (See page
4.
START ENGINE AND CHECK FOR ENGINE COOLANT
LEAKS
5.
INSTALL THROTTLE BODY COVER
SF0P8–03
B12806
Ohmmeter
SF–44
–
SFI
CAMSHAFT TIMING OIL CONTROL VALVE
2778
CAMSHAFT TIMING OIL CONTROL
VALVE
ON–VEHICLE INSPECTION
(a)
Remove the throttle body cover.
(b)
Remove the intake air connector.
(c)
Disconnect the oil control valve connector.
(d)
Using an ohmmeter, measure the resistance between the
terminals.
Resistance: 6.9 to 7.9
Ω
at 20
°
C (68
°
F)
If the resistance is not as specified, replace the valve.
(e)
Reconnect the oil control valve connector.
(f)
Reinstall the intake air connector.
(g)
Reinstall the throttle body cover.
SF0P9–04
B17488
Throttle Body Cover
PS Air Hose
Intake Air Connector
Suction Hose
MAF Meter Wire
PCV Hose
Vacuum Hose
Camshaft Oil Control
Valve (Bank 2)
N·m (kgf·cm, ft·lbf)
Non–reusable part
O–Ring
: Specified torque
O–Ring
Camshaft Oil Control
Valve (Bank 1)
7.5 (76, 66 in.·lbf)
–
SFI
CAMSHAFT TIMING OIL CONTROL VALVE
SF–45
2779
COMPONENTS
SF1XK–01
B01688
SF–46
–
SFI
CAMSHAFT TIMING OIL CONTROL VALVE
2780
REMOVAL
1.
REMOVE THROTTLE BODY COVER
2.
REMOVE INTAKE AIR CONNECTOR
3.
REMOVE CAMSHAFT TIMING OIL CONTROL VALVE
(a)
Disconnect the 2 camshaft oil control valve connectors.
(b)
Remove the bolt, camshaft oil control valve and O–ring.
Torque: 7.5 N·m (76 kgf·cm, 66 in.·lbf)
(c)
Remove the O–ring from the each camshaft oil control
valve.
HINT:
At the time of installation, please refer to the following items.
Use a new O–rings.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст