Toyota FJ Cruiser (GSJ 10, 15 series). Instruction — part 120
1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY
ES–429
ES
REMOVAL
1.
DISCONNECT CABLE FROM NEGATIVE BATTERY
TERMINAL
2.
DRAIN ENGINE COOLANT (See page
)
3.
REMOVE V-BANK COVER
(a) Remove the 2 nuts, then remove the V-bank cover.
4.
REMOVE AIR CLEANER ASSEMBLY
(a) Disconnect the No. 2 ventilation hose.
(b) Disconnect the vacuum hose.
(c) Disconnect the mass air flow meter connector.
(d) Disengage the 2 wire harness clamps.
(e) Loosen the 2 hose clamps.
(f)
Remove the 2 bolts.
(g) Disconnect the air cleaner hose and remove the air
cleaner.
A126474
A075594E01
A075595E01
A075596E01
ES–430
1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY
ES
5.
REMOVE THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Disconnect the No. 5 water by-pass hose.
(b) Disconnect the No. 4 water by-pass hose.
(c) Disconnect the throttle motor connector.
(d) Remove the 4 bolts, then remove the throttle w/
motor body and gasket.
(e) Remove the No. 5 water by-pass hose.
(f)
Remove the No. 4 water by-passe hose.
INSPECTION
1.
INSPECT THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Check the resistance.
(1) Using an ohmmeter, measure the resistance
between the terminals.
Standard resistance
If the result is not as specified, replace the
throttle with motor body assembly.
A126395
A075599E01
A126394
M+
M-
A059778E15
Tester Connection
Specified Condition
1 (M-) - 2 (M+)
0.3 to 100
Ω at 20°C (68°F)
1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY
ES–431
ES
INSTALLATION
1.
INSTALL THROTTLE WITH MOTOR BODY
ASSEMBLY
(a) Connect the No. 4 water by-pass hose to the throttle
body.
(b) Connect the No. 5 water by-passe hose to the
throttle body.
(c) Install a new gasket and the throttle with motor body
with the 4 bolts.
Torque: 11 N*m (112 kgf*cm, 9 ft.*lbf)
(d) Connect the throttle motor connector.
(e) Connect the No. 4 water by-pass hose.
(f)
Connect the No. 5 water by-pass hose.
2.
INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner onto the throttle body.
(b) Connect the air cleaner hose to the air cleaner.
(c) Install the air cleaner with the 2 bolts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
(d) Connect the mass air flow meter connector.
(e) Engage the 2 wire harness clamps.
(f)
Connect the vacuum hose.
A126394
A075599E01
A126395
A075596E01
A075595E01
ES–432
1GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY
ES
(g) Connect the No. 2 ventilation hose.
3.
CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
4.
ADD ENGINE COOLANT (See page
)
5.
CHECK FOR ENGINE COOLANT LEAKAGE (See
page
6.
INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
A075594E01
A126475
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст