Toyota FJ Cruiser (GSJ 10, 15 series). Instruction — part 225
FU–16
1GR-FE FUEL – FUEL INJECTOR
FU
(9) Connect the intelligent tester to the DLC3.
(10) Turn the ignition switch ON.
(11) Turn the intelligent tester ON.
(12) Select the following menu items: DIAGNOSIS /
ENHANCED OBD ll / ACTIVE TEST / FUEL
PUMP / SPD / ON.
(13) Install SST onto the fuel injector.
(14) Connect SST to the battery, then measure the
injection volume for 15 seconds. Perform the
inspection 2 or 3 times, then calculate the
average.
Standard:
NOTICE:
Always do the switching at the battery side.
If the result is not as specified, replace the fuel
injector.
(c) Check for fuel leakage.
(1) When checking the injection volume, remove
SST from the battery. Inspect the fuel leakage
from the fuel injector.
Standard:
1 drop or less every 12 minutes.
If the result is not as specified, replace the fuel
injector.
INSTALLATION
1.
INSTALL FUEL INJECTOR
(a) Install a new insulator onto each fuel injector.
(b) Apply a light coat of spindle oil or gasoline to a new
O-ring and install it onto each fuel injector.
Intelligent Tester
DLC3
CAN VIM
A129958E01
A075915E06
Injection Volume
Difference Between Each Fuel
Injector
76 to 91 cm
3
(4.6 to 5.5 cu in.) per 15
seconds
15 cm
3
(0.9 cu in.) or less
New O-ring
New Insulator
A075654E06
1GR-FE FUEL – FUEL INJECTOR
FU–17
FU
(c) While turning the fuel injector left and right, install it
onto the fuel delivery pipe.
(d) Position the fuel injector connector facing outward.
2.
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
(a) Place the fuel delivery pipe together with the 6 fuel
injectors on the intake manifold.
(b) Provisionally install the 6 bolts, which are used to
hold the fuel delivery pipe, onto the intake manifold.
(c) Check that the fuel injectors rotate smoothly.
HINT:
If the fuel injectors do not rotate smoothly, replace
the O-ring.
(d) Position each fuel injector connector facing outward.
(e) Tighten the 6 bolts, which are used to hold the fuel
delivery pipe, to the intake manifold.
Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf)
(f)
Connect the 6 fuel injector connectors.
3.
CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY
(a) Push the tube connector into the pipe until the tube
connector makes a "click" sound.
NOTICE:
•
Check if there is any damage or foreign
objects on the connected part of the fuel pipe.
•
After connecting, check that the pipe and
connector are securely connected by pulling
them.
(b) Install the fuel pipe clamp.
4.
CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
(a) Push the tube connector into the pipe until the tube
connector makes a "click" sound.
NOTICE:
•
Check if there is any damage or foreign
matter on the connected part of the fuel pipe.
•
After connecting, check that the pipe and
connector are securely connected by pulling
them.
(b) Install the fuel pipe clamp.
5.
INSTALL INTAKE AIR SURGE TANK
(a) Install a new gasket onto the intake air surge tank.
Turn
Connector
Push
A075655E04
Turn
Connector
A075656E03
FU–18
1GR-FE FUEL – FUEL INJECTOR
FU
(b) Using a socket hexagon wrench 8, install the intake
air surge tank with the 4 bolts.
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
(c) Install the 2 nuts.
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
(d) Install the 3 wire harness clamps and hose clamp.
(e) Connect the throttle body with motor connector.
(f)
Connect the 2 VSV connectors.
(g) Connect the ventilation hose.
(h) Connect the fuel vapor feed hose.
A075648
A075646E01
A075645
A126449
1GR-FE FUEL – FUEL INJECTOR
FU–19
FU
(i)
Connect the 2 water by-pass hoses.
6.
INSTALL NO. 2 SURGE TANK STAY
(a) Install the No. 2 surge tank stay with the 2 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
7.
INSTALL NO. 1 SURGE TANK STAY
(a) Install the No. 1 surge tank stay with the 2 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
8.
INSTALL OIL BAFFLE PLATE
(a) Install the oil baffle plate with the bolt.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
9.
INSTALL THROTTLE BODY BRACKET
(a) Install the throttle body bracket with the 2 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
10. INSTALL AIR CLEANER ASSEMBLY (See page
)
11. CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
12. ADD ENGINE COOLANT (See page
A126395
A126391
A126389
A126390
A126392
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст