Chery S11 / Chery QQ. Manual — part 52
Chery QQ Service Manual
Charging System
Note:
Take into consideration that the voltage varies with the temperature of the regulator
※
case.
Before this test, the discharged batte
※
ry must be fully charged.
Note: When the engine runs, never remove the terminal post of the battery, otherwise,
the electronic parts may be damaged.
Standard current: 10A (max.)
Standard voltage: 14.2-14.8V in 25°C
Higher voltage
If the voltage is higher than the standard value, replace the regulator of integrated
circuit.
Lower voltage
If the voltage is lower than the standard value, conduct the following check. Connect
the F terminal post to the ground connection, start the engine, and then measure the
voltage of B terminal post.
If the voltage goes up above the standard value, there is something wrong with the
engine.
Loading check
Make the engine run at a rotation speed of 2000r/min, and switch on the head lights
and the fan of heater system. And then measure the current. If the current is lower
- 24 -
Chery QQ Service Manual
Charging System
than 20A, repair or replace the generator.
Overcharged battery
1. Please see section “Battery” for ensuring the status of the battery.
2. The excessively effusion of electrolyte is the obvious indication of being
overcharged. Then remove the generator to repair, and check the exciting coil winding
for ground connection or short circuit. If any trouble exists, replace the rotor and
check to ensure the output voltage is within the specified range.
. Overhaul
Ⅲ
Removal and Installation
1. Remove negative cable from battery;
2. Disconnect the cable, which connects with terminal post B, and cable plugging
device;
3. Remove the bolt of engine cover (upside);
4. Remove the adjusting bolt of driving belt of generator;
- 25 -
Chery QQ Service Manual
Charging System
5. Remove the bolt of engine cover (downside), and
then remove the cover;
6. Remove the construction bolt to take out the belt
from the downside.
7. Install them in the step contrary to that of
removal, and adjust the driving belt to the specified
output tightness.
Tightening torque
(
a): 18~28N·m
(
b): 4~7 N·m
(
c): 6~10 N·m
Disassembly
1.For convenience of installation, find out the alignment index line in the
front cover and rear cover or make a fiducial mark.
(
1)Alignment index line
(
2)Front cover
(
3)Rear cover
2. Remove the bolt in the front cover from
generator.
1 Bolt
3. Insert a flat-head screwdriver or similar tool between stator core and front cover to
divide the generator into two parts, front part and
rear part.
1. Flat-head screwdriver
2. Stator core
3. Front cover
- 26 -
Chery QQ Service Manual
Charging System
4. Loosen the belt pulley nut with clamp and
remove the belt pulley.
Note:
When the clamp is used, a piece of clean cotton
cloth should be laid between rotor and clamp to
avoid the damage to rotor.
Always clamp the part “A” instead of part “B”, for
the structural strength of part B doesn't suit firm
clamping.
1a: Belt pulley nut 2: Clamp
3; Belt pulley bolt
4: Cotton cloth
5: Rotor
5. Remove the nut of B terminal post and isolator.
6. Remove 3 bolts and take off the rear cover.
7. Remove 3 bolts and pull out the brush carrier assembly.
8. Remove 3 bolts and pull out the regulator of integrated
circuit.
9. Remove 3 bolts and stretch the stator coil lead, and then take out the rectifier.
10. Remove the bolts and nuts in the rear frame, and then push out the rear frame with
rotor.
11. Remove the end housing bearing with
bearing puller.
Note: When the bearing puller is used, it
is subject to careful operation to avoid
deforming the cooling fan blade.
- 27 -
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст