Chery B11. Manual — part 201

Chery B11 Service Manual Steering

Section 5 Power steering oil pump

I. Disassembling and installation

1、 Pre-operation before disassembling

Exhaust power steering oil.

2、 Disassembling steps

(1) Power steering belt (4) Oil pump

(2) Fuel inlet tube (5) Bracket for power steering pump

(3) Oil tube 1

3、 Operation after installation

Fill power steering oil;

Adjust the tension of power steering belt;

Displacement of power steering line;

Check on oil pump pressure.

PDF created with pdfFactory Pro trial version

www.pdffactory.com

Chery B11 Service Manual Steering

II. Disassembling operation points

1、Disassembling of oil inflow tube/oil tube 1

Caution:

As the air-conditioned compressor under the oil pump, before

disassembling the oil tube, cover the air-conditioned compressor

with a piece of cloth.

III. Disassemble and reassembling

Cover

Liquid: AT gearbox oil

Seal set of oil pump

Element of oil pump

PDF created with pdfFactory Pro trial version

www.pdffactory.com

Chery B11 Service Manual Steering

1.Disassemble steps

(1) Pump cover (7) Side board (13) O-shape ring

(2) Lock pin (8) Oil seal (14) Flow control valve

(3) O-shape ring (9) O-shape ring (15) Flow control spring

(4) Vane (10) O-shape ring (16) Oil pump body

(5) Cam ring (11) Sealing washer

(6) Rotor (12) Joint

Caution:

Do not separate the flow control valve from the oil pump body.

IV. Check

The clearance between axle and the pump

Put the dial gauge against the axle end of belt gear assembly.

Measure the clearance by moving belt gear assembly up and

down.

Limit value:0.1 mm.

V. Reassembling operation points

1、

Installation of O-shape ring

No.

Internal

diameter*width

1

20.5×1.5

2

63×2.3

3

42×2

4

15.3×2

Connector

Pump cover

Side-board

Side view of side-board

PDF created with pdfFactory Pro trial version

www.pdffactory.com

Chery B11 Service Manual Steering

2.Installation of rotor

Fix the rotor to the belt gear assembly and keep the rotor hub lie in

the side of pump cover.

3.Installation of cam ring

Install the cam ring with the side logo slot facing side-board.

4.Installation of vane

Install the vane to the rotor, noticing the installation direction.

Cam ring

Lamina

Rotor

Hatch face to rotor

PDF created with pdfFactory Pro trial version

www.pdffactory.com

Была ли эта страница вам полезна?
Да!Нет
3 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности