Jaguar XJ (X350). Manual — part 366
109 . Install new intake manifold gaskets.
110
.
NOTE:
The intake manifold retaining bolts in position 1,2,3 and are longer than the retaining
bolts in position 4,5 and 6.
Install the intake manifold.
•
Tighten to 10 Nm.
111 . Connect the evaporative emission canister purge valve transfer pipe.
112 . Attach the intake manifold rear retaining bracket.
•
Tighten to 10 Nm.
113 . Attach the engine wiring harness from the intake manifold rear retaining bracket.
114 . Attach the intake manifold front retaining bracket.
•
Tighten to 10 Nm.
115 . Install the fuel pressure sensor bracket.
•
Tighten to 10 Nm.
www.
116 . Tighten to 7 Nm.
117 . Connect the fuel pressure sensor vacuum hose.
118 . Connect the electrical connectors.
119 . Connect the positive crankcase ventilation (PCV) hose.
120 . Connect the throttle position sensor electrical connector.
121 . Connect the throttle motor electrical connector.
www.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст