Discovery 2. Manual — part 709
HEATING AND VENTILATION
REPAIRS
80-31
7. Position container to collect spillage and
disconnect quick release fuel pipe from FBH.
CAUTION: Before disconnecting any part of
the fuel system, it is imperative that all dust,
dirt and debris is removed from around
components to prevent ingress of foreign
matter into fuel system.
8. Remove Torx bolt securing FBH to bulkhead
mounting bracket.
9. Release and remove FBH.
10. Collect locating bushes from pegs.
Refit
1. Fit bushes to pegs.
2. Align FBH to pegs, fit Torx bolt and tighten to 25
Nm (18 lbf.ft).
3. Clean quick release connection and fit fuel pipe
to FBH.
4. Connect multiplugs to FBH.
5. Connect coolant hoses to FBH and secure with
clips.
6. Release clamps from hoses.
7. Connect battery earth lead.
8. Fit and secure battery cover.
9. Top-up cooling system.
HEATING AND VENTILATION
80-32
REPAIRS
AIR CONDITIONING
DESCRIPTION AND OPERATION
82-1
AIR CONDITIONING
DESCRIPTION AND OPERATION
A/C refrigerant system component
layout
Diesel installation shown, V8 similar
1 Evaporator and thermostatic expansion valve
2 High pressure servicing connection
3 To rear A/C system (where fitted)
4 Low pressure servicing connection
5 Refrigerant lines
6 Receiver drier
7 Condenser
8 Compressor
AIR CONDITIONING
82-2
DESCRIPTION AND OPERATION
A/C control system component layout
RH drive shown, LH drive similar
1 Air temperature control ECU
2 Heater coolant temperature sensor
3 Evaporator temperature sensor
4 Dual pressure switch
5 Ambient temperature sensor
6 Sunlight sensor
7 In-car temperature sensor
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст