Frelander 2. Manual — part 429
Refer to:
Battery Tray
(414-01 Battery, Mounting and Cables,
Removal and Installation).
Recharge the A/C system.
Refer to:
Air Conditioning (A/C) System Recovery, Evacuation and
Charging
(412-00 Climate Control System - General Information,
General Procedures).
8.
Install the engine cover.
Refer to:
Engine Cover - I6 3.2L Petrol
(501-05 Interior Trim and
Ornamentation, Removal and Installation).
9.
Connect the battery ground cable and install the cover.
Refer to:
Specifications
(414-00 Battery and Charging System -
General Information, Specifications).
10.
Climate Control - Air Conditioning (A/C) CompressorTD4 2.2L Diesel
Removal and Installation
Removal
CAUTION: Make sure that the specified amount of refrigerant oil is added.
• NOTE: Removal steps in this procedure may contain installation details.
Disconnect the battery ground cable.
Refer to:
Specifications
(414-00 Battery and Charging System -
General Information, Specifications).
1.
Recover the A/C refrigerant.
Refer to:
Air Conditioning (A/C) System Recovery, Evacuation and
Charging
(412-00 Climate Control System - General Information,
General Procedures).
2.
3. CAUTIONS:
Make sure that all openings are sealed. Use new
blanking caps.
Lubricate the new seals with clean refrigerant oil.
• NOTE: Install new O-ring seals.
Torque: 24 Nm
3.
4.
WARNING: Make sure to support the vehicle with axle
stands.
Raise and support the vehicle.
4.
Remove the engine undershield.
Refer to:
Engine Undershield
(501-02 Front End Body Panels,
Removal and Installation).
5.
6.
Release the accessory drive belt from the A/C
compressor pulley.
7.
8.
Torque: 110 Nm
9.
Torque: 25 Nm
10.
Installation
To install, reverse the removal procedure.
1.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст