Frelander 2. Manual — part 460
Battery, Mounting and Cables - Battery
Diagnosis and Testing
For further information, refer to battery care manual and
REFER to: Charging System (414-00, Diagnosis and Testing).
Battery, Mounting and Cables - Battery
Removal and Installation
Removal
• NOTE: Removal steps in this procedure may contain installation details.
Remove the cover and disconnect the battery ground cable.
Refer to:
Specifications
(414-00 Battery and Charging System -
General Information, Specifications).
1.
2. NOTE: Apply petroleum jelly to the battery
terminals.
Torque: 5 Nm
2.
3.
Installation
To install, reverse the removal procedure.
1.
Battery, Mounting and Cables - Battery Tray
Removal and Installation
Removal
Remove the battery.
Refer to:
Battery
(414-01 Battery, Mounting and Cables, Removal
and Installation).
1.
2. NOTE: Removal steps in this procedure may contain
installation details.
Torque: 10 Nm
2.
3. NOTE: Do not disassemble further if the component
is removed for access only.
3.
Installation
To install, reverse the removal procedure.
1.
Generator and Regulator -
General Specification
Item
Specification
Generator - 3.2L Petrol:
Make/type
Bosch
Output
90/150 amps @25° C
Voltage control
Externally controlled by EMS using LIN protocol to communicate.
Voltage setpoint regulation
Controlled by software resident in EMS
Generator - 2.2L Diesel:
Make/type
Bosch
Output - Standard
90/150 amps @25° C
Output - Optional
105/180 amps @ 25° C
Voltage Control
Externally controlled by EMS using LIN protocol to communicate.
Voltage Regulation
Controlled by software resident in EMS
Torque Specifications
Description
Nm
lb-ft
Battery harness connection nut - 3.2L Petrol
12
9
battery cable to the generator nut - 2.2L Diesel
24
18
Drive belt idler pulley - 2.2L Diesel
48
35
Generator coupling
75
55
Generator bolts - 3.2L Petrol
24
18
Generator bolts - 2.2L Diesel
48
35
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст