Jeep Grand Cherokee WK. Manual — part 1178
33. Disconnect body ground strap (2) at the left side
cowl.
NOTE: It will be necessary to support the trans-
mission in order to remove the engine.
34. Position a suitable jack under the transmission.
35. Remove engine from the vehicle.
INSTALLATION - ENGINE
1. Position engine in the vehicle.
2. Remove jack from under the transmission.
3. Remove Engine Lifting Fixture Special Tool 8347
(3).
4. Remove Special Tools 8400 Lifting Studs.
9 - 1308
ENGINE - 4.7L SERVICE INFORMATION
WK
5. Position both the left and right side engine mount
brackets and install the through bolts (3) and nuts.
Tighten to 95 N·m (70 ft. lbs.)
6. Install transmission to engine mounting bolts (3).
Tighten the bolts to 41 N·m (30 ft. lbs.).
7. Install torque converter bolts (3).
WK
ENGINE - 4.7L SERVICE INFORMATION
9 - 1309
8. Connect both left (2) and right (3) side body ground
straps.
9. Position generator wiring behind the oil dipstick
tube, then install the oil dipstick tube upper mount-
ing bolt.
10. Install power steering pump.
11. Connect fuel supply line quick connect fitting
(Refer to 14 - FUEL SYSTEM/FUEL DELIVERY/
QUICK CONNECT FITTING - STANDARD PRO-
CEDURE).
12. Connect the vacuum lines at the throttle body and
intake manifold.
9 - 1310
ENGINE - 4.7L SERVICE INFORMATION
WK
13. Connect engine harness at the following points:
•
Intake Air Temperature (IAT) Sensor (4)
•
Idle Air Control (IAC) Motor (3)
•
Fuel Injectors
•
Throttle Position (TPS) Switch (2)
•
Engine Oil Pressure Switch
•
Engine Coolant Temperature (ECT) Sensor
•
Manifold Absolute Pressure (MAP) Sensor
•
Camshaft Position (CMP) Sensor
•
Coil Over Plugs
14. Position and install heater hoses (1) and tubes
onto intake manifold.
15. Install the heater hoses onto the heater core and
the engine front cover, and install clips (2).
WK
ENGINE - 4.7L SERVICE INFORMATION
9 - 1311
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст