Geely Emgrand X7. Manual part — 309
Geely Emgrand X7. Manual part - 309
5. Install 2nd speed gear needle bearing retaining
ring.
FE03-0129b
6. Install 2nd speed gear needle bearing.
FE03-0130b
7. Install the 2nd speed gear.
FE03-0131b
1235
8. Install the 3rd speed gear.
Notes :3rd speed gear required press by pressure bed,
upward of boss face!
FE03-0132b
9. Install bushing of 3rd speed gear and 4th speed
gear
10. Install the 4th speed gear
Notes : 4th speed gear was pressed by pressure, One
face is downward with boss!
FE03-0134b
11. Install the 5th speed gear.
Notes : 5th speed gear was pressure by pressure bed ,
one face is upward by boss
FE03-0135b
1236
12. Install 5th speed gear snap spring.
FE03-0136b
13. Install rear support bearing of main shaft.
FE03-0137b
14. Install main shaft assembly.
15. Install fork shaft.Refer to“3.4.8.6 fork shaft
replacement”.
16. Install shift control mechanism assembly, refer
to“3.4.8.4 shift control mechanism assembly
replacement”.
17. Install transmission assembly; refer to“3.4.8.3
transmission assembly replacement”.
1237
3.4.8.9 Shift control lever replacement
Dismantle procedure
Warning: refer to warning for battery
disconnection in the warning and precaution ,
1. Disconnect the battery negative cable. Refer to
2.11.8.1 battery cable disconnection/connection
procedures.
2. For dismantling of auxiliary instrument panel,
refer to 12.8.3.2 Replacement of auxiliary
instrument panel.
3. Dismantle 4 shift control lever fixing bolts as
shown in the figure.
NL03-0149b
4. Take out selecting rod of snap spring.
NL03-0150b
5. Dismantle fixing sleeve of selecting gear cable
Notes: Selecting lever cable hardly poke up, and then
Dismantle the selecting lever cable, black fixing
bushing is as a whole was intalled on the cable.
NL03-0151b
1238
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст