Geely Emgrand X7. Manual part — 121
Geely Emgrand X7. Manual part - 121
22. Dismantle the cylinder hood
assembly.
23. Dismantle the cylinder head
gasket component.
GC02-0054c
Installation Procedure:
1. Clean the seal surface of the
cylinder hood and engine block.
GC02-0055c
2. Install cylinder head gasket
components.
Note: Cylinder head gasket is a single
used item and must be replaced with
a new component.
3. Install cylinder head assembly.
4. Install the cylinder hood gasket
bolt gaskets.
GC02-0056c
483
5. Install and tighten the cylinder
hood bolts, according to the
sequence in the graph.
Torque
First31-39N . m(Metric)
Second 68-72N . m(Metric)
Third time 87-93N.m (Metric)
10
8
4
6
2
1
5
3
7
9
GC02-0057c
6. Install the warm water pipe for
the heater tank.
7. Install the radiator inlet and
outlet pipes.
8. Install
camshaft.
9. Install the VVT solenoid valve.
10. Install the camshaft position
sensor.
11.
Install the engine coolant
temperature sensor wiring
harness connector.
12. Install the fuel distributing pipe
assembly.
13. Install timing chain
14. Install the timing chain cover.
15. Install the drive belt.
16. Install the cylinder hood cover.
17. Install the ignition coil and
ignition wire.
18. Install the exhaust manifold.
19. Install the intake manifold
assembly.
20. Install the throttle body.
21. Fill the engine coolant.
22. Install the plastic shield of
engine.
23. Connect battery negative cable.
GC02-0051c
484
2.6.8.15 Cylinder Hood Assembly Disassembly and Assembly
Dismantlement Procedure
1. Refer to 2.6.8.14 “Replacement
of Cylinder Hood Assembly” to
dismantle the cylinder hood
assembly.
2. Dismantle the valve Lifter.
3. Use a special tool to compress
the valve springs.
GC02-0058c
4. Remove the valve locking plate
with a magnetic stick.
5. Remove the special tools and
remove the valve spring seat.
6. Remove the valve spring.
7. Remove the valve spring pads
with a magnetic stick.
8. Dismantle the valve, mark the
original position of the valve in
order to re-install.
GC02-0167b
9. Dismantle the valve seals with
the special tool GL301-006.
GL301-006
GC02-0059c
485
Cleaning for check:
1. Clean the contacting surface with the cylinder gasket.
2. Clean the mating surface with the cylinder hood cover.
3. Inspect and confirm that the cylinder hood and cylinder seal gasket contacting surface has no
scratches.
4. Inspect and confirm that the cylinder seal gasket contacting surface has no leakage or
channeling gas.
5. Inspect whether there are cracks on the cylinder hood.
6. Refer to 2.6.1.2 "Engine
Mechanical System
Specification" to measure the
height of the cylinder hood
within the measurement
allowance. If the height is lower
than the standard value, replace
the cylinder hood.
Standard Value: 128 . 9mm
7. Inspect and confirm that the
sealing surface has no distortion
and warping and the cylinder
hood sealing surface flatness
must be 0.04 mm.
8. Inspect and confirm that valve
seat ring has no excessive wear
and burnt places.
GC02-0060c
Installation Procedure:
1. Use a special tool GL301-008 to
install the special valve seals.
2. Install
the
valves.
3. Install the valve spring pads.
4. Install the valve springs.
5. Install the valve spring seat.
GL301-008
GC02-0061c
486
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст