Geely Emgrand X7. Manual part — 262
Geely Emgrand X7. Manual part - 262
7. Install bearing of crankshaft case
body.
FE02-0267b
8. After installing the crankshaft in
the front and rear crankshaft
bearings, inspect whether the
crankshaft journal has acceptable
roundness and runout.
Note: apply the lubricating grease on
the crankshaft journal and slightly
lubricate the crankshaft bearing!
9. Coat evenly sealant on the
interface between crankshaft case
body and cylinder block .
10. Install the crankshaft body.
FE02-0268b
11. Install and tighten the crankshaft
bearing cap bolts according to the
sequence shown in the graphic.
Torque
First44N.m(Metric)
32.5lb-ft(English system)
First44N.m(Metric)
32.5lb-ft(English system)
7
3
1
5
9
10
6
2
4
8
FE02-0269b
1047
12. Install fixing bolt of crankshaft
body.
7
3
1
5
9
10
6
2
4
8
FE02-0270b
13. Install the mounting bolts of oil
filter.
First44N.m(Metric) 32.5lb-ft(English
system)
14. Install pistons, connecting rods
and bearings.
15. Install the oil pan.
16. Install the oil pan.
17.Install the cylinder hood.
18. Install the crankshaft rear oil
seal.
19. Install the flywheel.
20. Install the gearbox.
21. Install the engine assembly.
FE02-0271b
1048
Torque: 18N.m or 13.4lb-ft
2.13.8.19 Piston Connecting Rod Components Disassembly, Assembly and Inspection
Note: Use the dedicated tools to carry out corresponding removal and installation.
Dismantlement Procedure
1. Dismantle the piston rod
components. Refer to 2.13.8.16
Replacement of Piston
Connecting Rod and Bearing.
2. Dismantle the first air ring.
FE02-0272b
3. Dismantle the second air ring.
FE02-0273b
4. Dismantle the oil ring’s upper
ring combination.
FE02-0274b
1049
5. Dismantle the oil ring’s lower
ring combination.
FE02-0275b
6. Dismantle the oil ring.
FE02-0276b
7. Dismantle the piston pin circlip
at both ends.
FE02-0277b
1050
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст