Lexus GS300/400 (2000 year). Manual — part 227
F01852
F01848
Matchmarks
SR–16
–
STEERING
POWER TILT AND POWER TELESCOPIC STEERING
COLUMN
2186
8.
INSTALL COLUMN UPPER BRACKET
(a)
Install the column upper bracket with 2 new tapered–
head bolts.
(b)
Tighter the 2 tapered–head bolts until the bolt heads
break off.
9.
INSTALL NO.2 INTERMEDIATE SHAFT ASSEMBLY
(a)
Align the matchmarks on the No.2 shaft and main shaft.
(b)
Install the bolt.
Torque: 35 N·m (360 kgf·cm, 26 ft·lbf)
10.
INSTALL KEY CYLINDER ILLUMINATION
11.
INSTALL TRANSPONDER KEY COIL
Install the transponder key coil with the screw.
SR0DP–01
F02563
F02562
A
B
Matchmarks
–
STEERING
POWER TILT AND POWER TELESCOPIC STEERING
COLUMN
SR–17
2187
INSTALLATION
1.
INSTALL DUST COVER
2.
INSTALL INTERMEDIATE SHAFT ASSEMBLY
Temporarily tighten the bolt A.
3.
INSTALL STEERING COLUMN ASSEMBLY
(a)
Torque the 4 column assembly set nuts.
Torque: 25 N·m (260 kgf·cm, 19 ft·lbf)
(b)
Tighten the hole cover clamp.
(c)
Install the brake pedal return spring.
(d)
Connect the connectors.
4.
CONNECT INTERMEDIATE SHAFT ASSEMBLY
(a)
Align the matchmarks on the intermediate shaft and con-
trol valve shaft.
(b)
Torque the bolt B.
Torque: 35 N·m (360 kgf·cm, 26 ft·lbf)
(c)
Torque the bolt A.
Torque: 35 N·m (360 kgf·cm, 26 ft·lbf)
5.
INSTALL HEATER TO REGISTER DUCT NO.7
6.
INSTALL NO.1 SAFETY PAD
(a)
Install the 4 pad set bolts and screw.
(b)
Install the 2 screws and connect the hood lock release le-
ver to the panel.
7.
INSTALL FINISH PLATE AND END PAD
8.
INSTALL NO.1 UNDER COVER
(a)
Connect the connectors.
(b)
Connect the OBD II.
(c)
Tighten the 3 screws.
9.
INSTALL SPIRAL CABLE
(See page
10.
INSTALL COMBINATION SWITCH WITH SPIRAL
CABLE
(a)
Tighten the 3 screws.
(b)
Connect the airbag connector.
(c)
Connect the 4 connectors.
11.
INSTALL UPPER AND LOWER COLUMN COVERS
Tighten the 3 screws.
F02564
Mark
F03676
Torx Screw
Screw Case
SR–18
–
STEERING
POWER TILT AND POWER TELESCOPIC STEERING
COLUMN
2188
12.
CENTER SPIRAL CABLE
(a)
Check that the front wheels are facing straight ahead.
(b)
Turn the cable counterclockwise by hand until it becomes
harder to turn the cable.
(c)
Then rotate the cable clockwise about 3 turns to align the
mark.
HINT:
The cable will rotate about 3 turns to either left or right of the
center.
13.
INSTALL STEERING WHEEL
(a)
Align the matchmarks on the wheel and main shaft.
(b)
Torque the wheel set nut.
Torque: 35 N·m (360 kgf·cm, 26 ft·lbf)
(c)
Connect the connector.
14.
INSTALL STEERING WHEEL PAD
NOTICE:
Make sure the wheel pad is installed to the specified
torque.
If the wheel pad has been dropped, or there are
cracks, dents or other defects in the case or connec-
tor, replace the wheel pad with a new one.
When installing the wheel pad, take care that the wir-
ings do not interfere with other parts and are not
pinched between other parts.
(a)
Connect the airbag connector.
(b)
Install the pad after confirming that the circumference
groove of the torx screw is caught on the screw case.
(c)
Using a torx socket wrench, torque the 2 screws.
Torque: 8.8 N·m (90 kgf·cm, 78 in.·lbf)
(d)
Install the steering wheel lower No.2 and No.3 covers.
15.
CHECK STEERING WHEEL CENTER POINT
F02555
Engine Under Cover
x16
Drive Belt
PS Vane pump
Assembly
Clip
Return Hose
Pressure Feed Tube
Union Bolt
Gasket
58 (590, 43)
49 (500, 36)
N·m (kgf·cm, ft·lbf)
: Specified torque
Non–reusable part
SR0DQ–01
–
STEERING
POWER STEERING VANE PUMP (2JZ–GE)
SR–19
2189
POWER STEERING VANE PUMP (2JZ–GE)
COMPONENTS
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст