Lexus SC300 / Lexus SC400. Manual — part 29
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
Back–up Power Source Circuit
CIRCUIT DESCRIPTION
This is the backup power source for the air conditioner control assembly. Power is supplied even when
the ignition switch is off and is used for diagnostic code memory, etc.
DIAGNOSTIC CHART
WIRING DIAGRAM
Check voltage between terminal B of air
conditioner control assembly connector
and body ground.
Check DOME fuse.
Proceed to next circuit inspection
shown on matrix chart (See page
Check and repair harness and connector
between air conditioner control assembly
and battery.
Check for short all in the harness
and components connecteds to
the DOME fuse (See attached wiring
diagram)
AC–74
–
AIR CONDITIONING SYSTEM
Troubleshooting
Check voltage between terminals B of air conditioner control assembly
connector and body ground.
(1)
Remove console upper panel.(See page
(2)
Remove A/C control assembly with connec–
tors still connected.
Measure voltage between terminals B of air condi-
tioner control assembly connector and body
ground.
Voltage:
10 – 14 V
Proceed to next circuit inspection shown on matrix
chart (See page
Check DOME fuse.
Remove DOME fuse from R/B No. 2.
Check continuity of DOME fuse.
Continuity.
Check for short in all the harness and
components connected to the DOME fuse
(See attached wiring diagram).
Check and repair harness and connector between air conditioner control assembly and battery.
INSPECTION PROCEDURE
–
AIR CONDITIONING SYSTEM
Troubleshooting
AC–75
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
ÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑÑ
Heater Main Relay Circuit
CIRCUIT DESCRIPTION
The heater main relay is switched on by signals from the air conditioner control assembly.
It supplies power to the blower motor.
DIAGNOSTIC CHART
Check voltage between terminals HR of air
conditioner control assembly connector
and body ground.
Check heater main relay.
Check HTR fuse.
Check and repair harness and connector
between air conditioner control assembly
and battery.
Proceed to next circuit inspection
shown on matrix chart (See page
Check for short in all the harness
and components connected to
the HTR fuse (See
attached wiring diagram).
Replace heater main relay.
WIRING DIAGRAM
AC–76
–
AIR CONDITIONING SYSTEM
Troubleshooting
Check voltage between terminals HR of air conditioner control assem-
bly connector and body ground.
(1)
Remove console upper panel.(See page
(2)
Remove A/C control assembly with connec–
tors still connected.
Proceed to next circuit inspection shown on ma-
trix chart (See page
).
Check heater main relay.
Check continuity between each pair of terminals of
heater main relay shown below.
Measure voltage between terminals HR of air condi-
tioner control assembly and body ground when
ignition switch is on and off.
(1)
Apply battery voltage between terminals 1
and 3
(2)
Check continuity between each pair of ter–
minal shown below.
Replace heater main relay.
Remove HTR fuse from J/B No. 1.
Check continuity of HTR fuse
Continuity
Check for short in all the harness and
components connected to the HTR fuse
See attached wiring diagram).
Check and repair harness and connector between air conditioner control assembly and battery.
INSPECTION PROCEDURE
–
AIR CONDITIONING SYSTEM
Troubleshooting
AC–77
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст