Mazda 6. Manual — part 195
AUTOMATIC TRANSAXLE
K–25
K
6. Inspect wave profile.
• PCM terminal: 3C (+) - 1D (-)
• Oscilloscope setting: 1 V/DIV (Y), 2.5 ms/DIV
(X), DC range
• Vehicle condition: drive the vehicle with 32
km/h{20 mph}
— If wave profile or voltage are out of
specifications, carry out the “Open Circuit
Inspection” or “Short Circuit Inspection”
Power Supply Voltage Inspection
1. Disconnect the VSS connector.
2. Turn the ignition switch to ON.
3. Measure voltage at VSS connector terminal B
(wiring harness side).
Specification
4.5—5.5 V
• If voltage is okay, go to Open Circuit
Inspection and Short Circuit Inspection.
• If voltage is wrong, repair wiring harness
between VSS and PCM.
Open Circuit Inspection
1. Inspect the following circuit for open.
• Power circuit (VSS connector terminal A to main relay terminal D)
• Ground circuit (VSS connector terminal C to GND)
• If an open circuit or short circuit is found, repair the malfunctioning wiring harness.
• If there are no open or short circuits, perform the sensor rotor inspection.
Short Circuit Inspection
1. Inspect the following circuit for short.
• Power circuit (VSS connector terminal A to
main relay terminal D)
• If an open circuit or short circuit is found,
repair the malfunctioning wiring harness.
• If there are no open or short circuits, perform
the sensor rotor inspection.
Sensor Rotor Inspection
1. Remove the VSS. (See
K–26 VEHICLE SPEEDOMETER SENSOR (VSS) REMOVAL/INSTALLATION
.)
2. Shift the selector lever to N position.
3. Inspect sensor rotor surface via VSS installation hole while rotating the front tire manually.
(1) Is sensor rotor free of damage and cracks?
(2) Is sensor rotor free of any metallic shavings or particles?
• If sensor rotor is okay, replace the VSS.
• If there is a problem, clean or replace the sensor rotor.
End Of Sie
A6E5614W102
A6E5614W033
A6E5614W035
K–26
AUTOMATIC TRANSAXLE
VEHICLE SPEEDOMETER SENSOR (VSS) REMOVAL/INSTALLATION
A6E561401030W06
Caution
• Water or foreign objects entering the connector can cause a poor connection or corrosion. Be
sure not to drop water or foreign objects on the connector when disconnecting it.
• If foreign materials are stuck to the VSS, disturbance by magnetic flux can cause sensor output to
be abnormal and thereby negatively affect control. Make sure that foreign materials such as iron
filings are not stuck to the VSS during installation.
1. Disconnect the negative battery cable.
2. Remove the under cover.
3. Disconnect the VSS connector.
4. Remove the VSS.
5. Apply ATF to a new O-ring and install it on a new
VSS.
6. Install the VSS.
Tightening torque
8—11 N·m {82—112 kgf·cm, 71—97 in·lbf}
7. Connect the VSS connector.
8. Install the under cover.
9. Connect the negative battery cable.
End Of Sie
SOLENOID VALVE INSPECTION
A6E561421280W01
Resistance Inspection (On-Vehicle Inspection)
Caution
• Water or foreign objects entering the connector can cause a poor connection or corrosion. Be
sure not to drop water or foreign objects on the connector when disconnecting it.
1. Disconnect the negative battery cable.
2. Remove the air cleaner component. (See
F–10 INTAKE-AIR SYSTEM REMOVAL/INSTALLATION
3. Disconnect the transaxle connector.
Note
• When inspecting the pressure control
solenoid, connect the ground connection to
the ground terminal (terminal I) of the
pressure control solenoid inside the solenoid
valve connector.
A6E5614W037
A6E5614W037
A6E5614W021
AUTOMATIC TRANSAXLE
K–27
K
4. Measure the resistance between the following
terminals.
• If not as specified, inspect the ground, then
perform the operating inspection.
ATF temperature: –40—150
°C {–40—302 °F}
5. Connect the transaxle connector.
6. Install the air cleaner component. (See
F–10 INTAKE-AIR SYSTEM REMOVAL/INSTALLATION
7. Connect the negative battery cable.
Operating Inspection
1. Disconnect the transaxle connector.
Caution
• Do not apply battery position voltage to terminals A, B, C, D, F and G for more than three seconds.
Note
• Because the operation sound of the valves is small, perform inspection in a quiet place.
2. Apply battery positive voltage to terminals A,B,C, F or G and battery negative voltage to GND, and verify that
operating sound is heard from solenoid.
• If the "click" is not heard, inspect the transaxle harness.
— If the transaxle harness is okay, perform the resistance inspection (off-vehicle inspection).
— If there is a problem, repair or replace the transaxle harness.
3. Apply battery positive voltage to terminal D and
battery negative voltage to terminal I, and verify
that operating sound is heard from solenoid.
• If the "click" is not heard, inspect the transaxle
harness.
— If transaxle harness is okay, perform the
resistance inspection (off-vehicle
inspection)
— If there is a problem, repair or replace the
transaxle harness.
Resistance Inspection (Off-Vehicle Inspection)
1. Remove the control valve body. (See
K–28 SOLENOID VALVE REMOVAL/INSTALLATION
2. Measure the resistance of each solenoid valve individually.
• If not as specified, replace the solenoid valve.
3. Install the control valve body. (See
K–28 SOLENOID VALVE REMOVAL/INSTALLATION
Terminal
Solenoid valve
Resistance
(ohm)
A—GND
Shift solenoid A
1.0—4.2
C—GND
Shift solenoid B
1.0—4.2
G—GND
Shift solenoid C
1.0—4.2
B—GND
Shift solenoid D
10.9—26.2
F—GND
Shift solenoid E
10.9—26.2
D—I
Pressure control
2.4—7.3
A6E5614W039
A6E5614W040
K–28
AUTOMATIC TRANSAXLE
Pressure control solenoid
Resistance
2.4—7.3 ohms
(ATF temperature: –40—150
°C {–40—302
°F})
Shift solenoid A, B, C
Resistance
1.0—4.2 ohms
(ATF temperature: –40—150
°C {–40—302
°F})
Shift solenoid D, E
Resistance
10.9—26.2 ohms
(ATF temperature: –40—150
°C {–40—302
°F})
End Of Sie
SOLENOID VALVE REMOVAL/INSTALLATION
A6E561421280W02
1. Disconnect the negative battery cable.
2. Remove the under cover.
3. Remove the control valve body. (See
K–34 CONTROL VALVE BODY REMOVAL
.)
4. Remove the solenoid valve(s).
5. Apply ATF to a new O-ring and install it on the
solenoid valve.
A6E5614W041
A6E5614W042
A6E5614W043
A6E5614W044
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст