Mazda Engine SKYACTIV-G 2.5. Manual — part 3
GENERAL INFORMATION
00-00–6
ABBREVIATIONS
id000000010100
End Of Sie
GAIHAN: -
FUNDAMENTAL PROCEDURES
id000000750100
Preparation of Tools and Measuring Equipment
• Be sure that all necessary tools and measuring
equipment are available before starting any work.
Special Service Tools
• Use special service tools or equivalent when they
are required.
Disassembly
• If the disassembly procedure is complex,
requiring many parts to be disassembled, all parts
should be marked in a place that will not affect
their performance or external appearance and
identified so that reassembly can be performed
easily and efficiently.
ATX
Automatic Transaxle
EX
Exhaust
HLA
Hydraulic Lash Adjuster
IN
Intake
MTX
Manual Transaxle
OCV
Oil Control Valve
TDC
Top Dead Center
SST
Special Service Tool
bpe2ue00000110
49 SE01 310
bpe2ue00000111
bpe2ue00000112
GENERAL INFORMATION
00-00–7
00-00
Inspection During Removal, Disassembly
• When removed, each part should be carefully
inspected for malfunction, deformation, damage
and other problems.
Arrangement of Parts
• All disassembled parts should be carefully
arranged for reassembly.
• Be sure to separate or otherwise identify the parts
to be replaced from those that will be reused.
Cleaning of Parts
• All parts to be reused should be carefully and
thoroughly cleaned in the appropriate method.
Warning
• Using compressed air can cause dirt and
other particles to fly out causing injury to
the eyes. Wear protective eye wear
whenever using compressed air.
Reassembly
• Standard values, such as torques and certain
adjustments, must be strictly observed in the
reassembly of all parts.
• If removed, the following parts should be replaced
with new ones:
—
Oil seals
—
Gaskets
—
O-rings
—
Lockwashers
—
Cotter pins
—
Nylon nuts
bpe2ue00000113
bpe2ue00000114
bpe2ue00000002
bpe2ue00000115
• Depending on location:
—
Sealant and gaskets, or both, should be
applied to specified locations. When sealant
is applied, parts should be installed before
sealant hardens to prevent leakage.
—
Oil should be applied to the moving
components of parts.
—
Specified oil or grease should be applied at
the prescribed locations (such as oil seals)
before reassembly.
Adjustment
• Use suitable gauges and testers when making
adjustments.
Rubber Parts and Tubing
• Prevent gasoline or oil from getting on rubber
parts or tubing.
Torque Formulas
• When using a torque wrench-SST or equivalent
combination, the written torque must be
recalculated due to the extra length that the
SST
or equivalent adds to the torque wrench.
Recalculate the torque by using the following
formulas. Choose the formula that applies to you.
A : The length of the
SST past the torque wrench drive.
L : The length of the torque wrench.
bpe2ue00000116
bpe2ue00000117
bpe2ue00000118
Torque Unit
Formula
N·m
N·m × [L/(L+A)]
kgf·m
kgf·m × [L/(L+A)]
kgf·cm
kgf·cm × [L/(L+A)]
ft·lbf
ft·lbf × [L/(L+A)]
in·lbf
in·lbf × [L/(L+A)]
0
1
1
2
2
3
3
SST
A
L
bpe2ue00000119
GENERAL INFORMATION
00-00–9
00-00
Vise
• When using a vise, put protective plates in the
jaws of the vise to prevent damage to parts.
End Of Sie
PROTECTIVE PLATES
bpe2ue00000120
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст