Mazda CX 7. Manual — part 106
MECHANICAL [L3 WITH TC]
01-10–27
01-10
2007 Mazda CX-7 Workshop Manual (1871–1U–06B)
Revised 9/2006 (Ref. No. R115/06)
Rear Oil Seal Installation Note
1. Apply silicone sealant to the areas shown in the
figure.
Caution
• Install the rear oil seal within 10 min of
applying the silicone sealant.
Thickness
4.0— 6.0 mm {0.16— 0.23 in}
2. Apply clean engine oil to a new rear oil seal.
3. Install the SST to the non-woven fabric side of the
rear oil seal.
4. From the back side of the rear oil seal, verify that
there is no damage or separation in the lip area of
the rear oil seal.
5. Install the rear oil seal to the engine as shown in
the figure.
6. Tighten the rear oil seal installation bolts in the
order shown in the figure.
Tightening torque
8.0— 11.5 N·m {82— 117 kgf·cm, 71— 101
in·lbf}
End Of Sie
WM: VARIABLE VALVE TIMING ACTUATOR
SEALANT
acxuuw00000147
303-328
(49 UN30 3328)
NON-WOVEN FABRIC
acxuuw00002559
BACK SIDE OF REAR OIL SEAL
LIP AREA
acxuuw00002560
acxuuw00002561
4
6
3
5
1
2
acxuuw00000149
MECHANICAL [L3 WITH TC]
01-10–28
2007 Mazda CX-7 Workshop Manual (1871–1U–06B)
VARIABLE VALVE TIMING ACTUATOR INSPECTION[L3 WITH TC]
id011039801200
Caution
• Due to the precision interior construction of the variable valve timing actuator, it cannot be
disassembled.
1. Disconnect the negative battery cable.
2. Remove the charge air cooler. (See01-13-5 INTAKE AIR SYSTEM REMOVAL/INSTALLATION[L3 WITH TC].)
3. Remove the ignition coils. (See01-18-2 IGNITION COIL REMOVAL/INSTALLATION[L3 WITH TC].)
4. Remove the spark plugs. (See01-18-3 SPARK PLUG REMOVAL/INSTALLATION[L3 WITH TC].)
5. Disconnect the wiring harness.
6. Remove the ventilation hose.
7. Remove cylinder head cover. (See01-10-10 TIMING CHAIN REMOVAL/INSTALLATION[L3 WITH TC].)
8. Verify that the groove of the rotor and notch of the
cover on the variable valve timing actuator are
aligned and fitted.
• If they are not aligned, rotate the crankshaft in
the direction of engine rotation two times and
verify that they are aligned.
— If they will not align, replace the variable
valve timing actuator.
• If under any condition, the variable valve
timing actuator always makes a hitting noise
directly after the camshaft exceeds maximum
lift while rotating the crankshaft two times in
the direction of engine rotation, replace the
variable valve timing actuator as it has not
been fixed.
9. Install the cylinder head cover. (See01-10-10 TIMING CHAIN REMOVAL/INSTALLATION[L3 WITH TC].)
10. Install the ventilation hose.
11. Connect the wiring harness.
12. Install the spark plugs. (See01-18-3 SPARK PLUG REMOVAL/INSTALLATION[L3 WITH TC].)
13. Install the ignition coils. (See01-18-2 IGNITION COIL REMOVAL/INSTALLATION[L3 WITH TC].)
14. Install the charge air cooler. (See01-13-5 INTAKE AIR SYSTEM REMOVAL/INSTALLATION[L3 WITH TC].)
15. Connect the negative battery cable.
End Of Sie
VARIABLE VALVE TIMING ACTUATOR REMOVAL/INSTALLATION[L3 WITH TC]
id011039801100
Caution
• Remove the variable valve timing actuator and camshaft sprocket as a single unit.
Note
• The variable valve timing actuator and camshaft sprocket cannot be disassembled.
1. Referring to the valve clearance adjustment procedure, remove the variable valve timing actuator and the
camshaft on the intake air side as a single unit. (See01-10-4 VALVE CLEARANCE INSPECTION/
ADJUSTMENT[L3 WITH TC].)
2. Remove the variable valve timing actuator.
(1) Place alignment marks on the camshaft and variable valve timing actuator as shown in the figure so that the
variable valve timing actuator is re-assembled in its original position.
(2) Fix the camshaft in a vise.
(3) Loosen the variable valve timing actuator
installation bolt.
End Of Sie
NOTCH
acxuuw00000143
MARK
acxuuw00000144
MECHANICAL [L3 WITH TC]
01-10-28–1
01–10
2007 Mazda CX-7 Workshop Manual (1871–1U–06B)
01-10-28
MECHANICAL [L3 WITH TC]
3. Install a new washer.
4. Install the variable valve timing actuator.
(1) Fix the camshaft in a vise.
(2) Align the marks on the camshaft and the
variable valve timing actuator.
Caution
• If replacing with a new variable valve
timing actuator, place alignment marks in
the same positions as those prior to the
replacement.
(3) Tighten the variable valve timing actuator
installation bolt.
Tightening torque
69— 75 N·m {7.1— 7.6 kgf·m, 51— 55 ft·lbf}
5. Referring to the valve clearance adjustment procedure, install the variable valve timing actuator and camshaft
on the intake air side as a single unit. (See01-10-4 VALVE CLEARANCE INSPECTION/ADJUSTMENT[L3
WITH TC].)
End Of Sie
R
acxuuw00000145
MECHANICAL [L3 WITH TC]
01-10-28–2
2007 Mazda CX-7 Workshop Manual (1871–1U–06B)
THIS PAGE INTENTIONALLY
LEFT BLANK
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст