Mazda Protege 5. Manual — part 171
CONTROL SYSTEM [ZM]
01–40A–37
01–40A
Circuit Open/Short Inspection
1. Remove the PCM. (See 01–40A–7 PCM REMOVAL/INSTALLATION [ZM].)
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9—10.7 N·m
{80—110 kgf·cm, 69.5—95.4 in·lbf}
4. Inspect for an open or short circuit in the following
wiring harnesses by probing the applicable
sensor and SST (104 Pin Breakout Box) terminals
with ohmmeter leads.
•
If there is an open or short circuit, repair or
replace wiring harnesses.
•
If there is no open or short circuit, replace the HO2S.
Open circuit
•
HO2S signal circuit (HO2S connector terminal
A and PCM connector terminal 60 (Front), 35
(Rear))
•
GND circuit (HO2S connector terminal B and
PCM connector terminal 91)
Short circuit
•
HO2S signal circuit (HO2S terminal A and
PCM connector terminal 60 (Front), 35 (Rear)
to GND)
5. Reconnect the HO2S connector.
HO2S Heater (Front and Rear) Resistance Inspection
1. Disconnect the HO2S (Front or Rear) connector.
2. Measure the resistance between HO2S terminals C and D using an ohmmeter.
•
If not as specified, replace the HO2S.
•
If the HO2S heater is okay, but PID value or PCM terminal 94 (Front), 93 (Rear) voltage are out of
specification, carry out the “Circuit Open/Short Inspection”.
Specification
Front: Approx. 5.6 ohms
Rear: Approx. 15.7 ohms
X3U140WBN
Z3U0140W024
Z3U0140W023
1712-1U-01G(01-40A).fm 37 ページ 2001年6月29日 金曜日 午前9時50分
CONTROL SYSTEM [ZM]
01–40A–38
Circuit Open/Short Inspection
1. Remove the PCM. (See 01–40A–7 PCM REMOVAL/INSTALLATION [ZM].)
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9—10.7 N·m
{80—110 kgf·cm, 69.5—95.4 in·lbf}
4. Inspect for an open or short circuit in the following
wiring harnesses by probing the applicable
sensor and SST (104 Pin Breakout Box) terminals
with ohmmeter leads.
•
If there is an open or short circuit, repair or
replace wiring harnesses.
•
If there is no open or short circuit, replace the
HO2S.
Open circuit
•
Control circuit (HO2S connector terminal C
and ignition switch (IG1) circuit through
common connector)
•
GND circuit (HO2S connector terminal D and
PCM connector terminal 94 (Front), 93
(Rear))
Short circuit
•
Control circuit (HO2S connector terminal C and ignition switch (IG1) circuit through common connector to
GND)
•
GND circuit (HO2S connector terminal D and PCM connector terminal 94 (Front), 93 (Rear) to GND)
5. Reconnect the HO2S connector.
End Of Sie
EGR BOOST SENSOR INSPECTION [ZM]
A3U014018211W02
Note
•
Perform the following test only when directed.
•
The following vacuum values are indicated by relative pressure from barometric pressure.
1. Remove the PCM. (See 01–40A–7 PCM REMOVAL/INSTALLATION [ZM].)
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector bolt.
Tightening torque
7.9—10.7 N·m
{80—110 kgf·cm, 69.5—95.4 in·lbf}
Caution
••••
Do not apply vacuum outside of the
specified limits, or EGR boost sensor will
be damaged.
4. Turn the ignition switch to ON.
X3U140WBN
Z3U0140W024
X3U140WAX
1712-1U-01G(01-40A).fm 38 ページ 2001年6月29日 金曜日 午前9時50分
CONTROL SYSTEM [ZM]
01–40A–39
01–40A
5. Disconnect the vacuum hose between the EGR
boost sensor and intake manifold.
Note
•
The output voltage varies with the
measuring condition.
6. Verify that the PCM terminal 34 voltage is within
specification.
Measuring condition:
Input voltage: 4.5—5.5 V
Ambient temperature: 10—50
°°°°
C {50—122
°°°°
F}
Sea level: –20—3,000 m {–656—9,840 ft}
Specification
BARO V variation: 2.3—4.7 V
7. Apply vacuum of –26.6 kPa {–200 mmHg, –7.85 inHg} to EGR boost sensor and verify that PCM 34 terminal
voltage from Step 6 is within specification.
•
If not as specified, carry out the “Circuit Open/Short Inspection”.
Specification
BARO V variation: 0.8—1.3 V
Circuit Open/Short Inspection
1. Remove the PCM. (See 01–40A–7 PCM REMOVAL/INSTALLATION [ZM].)
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9—10.7 N·m
{80—110 kgf·cm, 69.5—95.4 in·lbf}
4. Inspect for an open or short circuit in the following
wiring harnesses by probing the applicable
sensor and SST (104 Pin Breakout Box) terminals
with ohmmeter leads.
•
If there is an open or short circuit, repair or
replace wiring harnesses.
•
If there is no open or short circuit, replace the EGR boost sensor.
Open circuit
•
EGR boost (Barometric pressure) signal circuit (EGR boost sensor connector terminal A and PCM
connector terminal 34)
•
Constant voltage circuit (EGR boost sensor connector terminal C and PCM connector terminal 90)
•
GND circuit (EGR boost sensor connector terminal B and PCM connector terminal 91)
Short circuit
•
EGR boost (Barometric pressure) signal
circuit (EGR boost sensor connector terminal
A and PCM connector terminal 34)
•
Constant voltage circuit (EGR boost sensor
connector terminal C and PCM connector
terminal 90)
5. Reconnect the EGR boost sensor connector.
End Of Sie
X3U140WAY
X3U140WBN
Y3U140WA7
1712-1U-01G(01-40A).fm 39 ページ 2001年6月29日 金曜日 午前9時50分
CONTROL SYSTEM [ZM]
01–40A–40
FUEL TANK PRESSURE SENSOR INSPECTION [ZM]
A3U014018212W02
Note
•
Perform the following test only when directed.
•
The following vacuum values are indicated by relative pressure from barometric pressure.
1. Remove the PCM. (See 01–40A–7 PCM REMOVAL/INSTALLATION [ZM].)
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector bolt.
Tightening torque
7.9—10.7 N·m
{80—110 kgf·cm, 69.5—95.4 in·lbf}
Caution
••••
Do not apply vacuum outside of the
specified limits, or the fuel tank pressure
sensor will be damaged.
4. Turn the ignition switch to ON.
5. Apply pressure then vacuum to the fuel tank
pressure sensor according to the following
procedure.
Note
•
The output voltage varies with the
measuring condition.
6. Decrease the applied pressure from +.66 kPa
{+50 mmHg, +1.97 inHg} to –6.66 kPa {–50
mmHg, –1.97 inHg} and verify that the PCM
terminal 62 voltage decreases accordingly as
specified.
•
If not as specified, replace the fuel tank
pressure sensor.
•
If fuel tank pressure sensor is okay, but PCM terminal 62 voltage is out of specification, carry out the
“Circuit Open/Short Inspection”.
Specification
*
: Measuring condition is as follows.
Input voltage: 5.0 V
Barometric pressure: 101.3 kPa {760 mmHg, 29.9 inHg} (Absolute pressure)
Barometric temperature: 30—100
°°°°
C {0—182
°°°°
F}
Applied vacuum
Output voltage (V)*
–6.66 kPa
{–50 mmHg, –1.97 inHg}
0.45—0.55
0 kPa {0 mmHg, 0 inHg}
2.25—2.75
+6.66 kPa
{+50 mmHg, +1.97 inHg}
4.05—4.95
X3U140WB3
X3U140WB4
1712-1U-01G(01-40A).fm 40 ページ 2001年6月29日 金曜日 午前9時50分
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст