DAF CF65, CF75, CF85 Series . Manual — part 220
©
200324
3-5
Inspection and adjustment
PE ENGINE
CF65/75/85 series
2
5
Adjusting the timing gear
1.
Remove the valve cover from cylinders 1-2-
3. See "Removal and Installation".
2.
Position cylinder 1 at top dead centre (TDC
on the flywheel, cylinder 6 in overlap
position).
3.
Remove the timing gear cover. See
"Removal and installation".
Note:
When the crankshaft (1) or the camshaft (2)
of an engine is rotated separately without an
idler gear (3), the engine's pistons may touch
the valves.
4.
Remove the idler gear (3). See "Removal
and installation".
5.
Rotate the camshaft gear (2) to such a
position that the idler gear (3) can be
installed in accordance with the marks.
6.
Fit the idler gear and tighten the attachment
bolt to the specified torque. See "Technical
data".
7.
Fit the timing cover. See "Removal and
installation".
8.
Fit the valve cover. See "Removal and
installation".
M201281
2
1
3
4
PE ENGINE
3-6
©
200324
Inspection and adjustment
5
CF65/75/85 series
2
3.4 INSPECTION OF AUTOMATIC POLY-V-BELT TENSIONER
Inspection of automatic poly-V-belt tensioner
1.
Remove the poly-V-belt and switch off the
automatic tensioner (0). See "Removal and
installation".
2.
Place a torque wrench on the hexagonal
head of the automatic tensioner.
3.
At the specified torsional distance (A) the
torsional moment must have a certain value.
See "Technical data".
The automatic tensioner must be replaced if
the measured value is not the same as the
reference value.
4.
Fit the poly-V-belt. See "Removal and
installation".
0
M201274
A
©
200324
3-7
Inspection and adjustment
PE ENGINE
CF65/75/85 series
2
5
3.5 INSPECTION AND ADJUSTMENT, V-BELT TENSION
Inspecting the V-belt tension
1.
Check the V-belt tension of the airc
onditioning-compressor drive with the Krikit I,
special tool (DAF no. 1240442).
2.
Set the gauge to zero by depressing the
measuring arm (1).
3.
Place the belt tension gauge on the V-belt,
halfway between the two pulleys.
4.
Slowly depress the V-belt by means of the
belt-tension gauge until a click is heard.
Then remove the belt tension gauge
carefully. Take care not to let the measuring
arm move.
5.
Take the reading as indicated by the position
of the measuring arm in relation to the scale.
Compare this reading with the
recommended pre-tension, see main group
"Technical data".
Adjusting the V-belt tension of air
conditioning compressor drive
1.
Slacken the central bolt (1) of the tensioning
roller.
2.
Turn the adjusting screw (2) until the V-belt
tension is correct. See "Technical data".
3.
Tighten the central bolt (1).
1
M2061
M2062
1
2
M200885
PE ENGINE
3-8
©
200324
Inspection and adjustment
5
CF65/75/85 series
2
3.6 INSPECTION, FLYWHEEL
1.
If the flywheel shows cracks on the abutting
surface with the clutch plate, the flywheel
may be ground down, provided that the
cracks are not within 5 mm of the inner rim.
2.
The flywheel has an indicator groove for
inspection purposes.
3.
Grinding down is allowed until the indicator
groove is no longer visible. This means that
a maximum of 2 mm may be ground down.
Checking flywheel run-out
1.
Clean the flywheel.
2.
Place a metal strip on the edge of the
flywheel housing to fit a dial gauge.
3.
Place the dial gauge on the metal strip.
4.
Place the stylus of the dial gauge at the
specified distance. See "Technical data".
5.
Set the dial gauge to "0".
6.
Use the special tool (DAF no. 1310477) to
crank the engine through 360
°, and measure
the maximum dial gauge reading. Compare
this reading with the technical data. See
"Technical data".
5 mm
2 mm
5 mm
M2 00 033
M200230
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст