DAF CF65, CF75, CF85 Series . Manual — part 238
©
200324
7-1
Cleaning
PE ENGINE COOLING SYSTEM
CF65/75/85 series
2
6
7. CLEANING
7.1 CLEANING THE EXTERIOR OF RADIATOR/AIR COOLER
}
Inhalation of dust may have serious
consequences for your health. Take
the necessary precautions, such as
wearing goggles and a face mask.
Cleaning wire mesh
1.
Remove the lower grille.
2.
Remove the wire mesh.
3.
Clean the wire mesh.
Cleaning, radiator/air cooler
With the aid of a simple tool, the radiator and the
air cooler can be blow-cleaned.
This tool can be made in your own workshop. It
cannot be ordered from DAF.
Key to drawing:
1.
Solder up
2.
Solder
3.
Quick-release coupling for air hose
4.
Steel pipe, ø 10 mm
5.
6 x ø 1.5 mm between holes, with a centre-
to-centre distance between the holes of 7
mm, drilled on one side.
Note:
Make sure that the air cooler and radiator
element are not damaged when positioning the
radiator cleaner.
1.
From below, insert the radiator cleaner (4)
between the air cooler (1) and radiator (2),
with the air holes facing the air cooler (1).
2.
Apply air pressure to the radiator cleaner (4)
and continue blow-cleaning the air cooler (1)
until no more dirt comes out.
100mm
5mm
2
1150mm
2
4
3
5
5
4
1
1
M2108
1
2
3
4
M2109
P
PE ENGINE COOLING SYSTEM
7-2
©
200324
Cleaning
6
CF65/75/85 series
2
3.
Turn the radiator cleaner over, turning the
holes towards the radiator (2), and blow-
clean the radiator (2).
4.
Fit the wire mesh.
5.
Install the lower grille.
1
2
3
4
M2110
P
©
200324
7-3
Cleaning
PE ENGINE COOLING SYSTEM
CF65/75/85 series
2
6
7.2 FLUSHING COOLING SYSTEM
}
In order to avoid damaging the
cylinder block, do not top up a warm
engine with cold coolant. Coolant is
a toxic fluid and must be handled
with care. Protect skin and eyes.
Coolant is harmful to the
environment; after use, it should be
processed as industrial chemical
waste. When the coolant is hot, there
is overpressure in the cooling
system. When removing the filler
cap, allow the overpressure to
escape by first loosening the filler
cap one turn.
1.
Drain the cooling system at the cylinder
block via the drain tap (A), the radiator via
drain plug B and the oil cooler via plug C. If
an integrated retarder is fitted, remove the
coolant drain plug of the heat exchanger.
2.
Flush the cooling system.
3.
Close the drain cock (A) and fit drain plug B
and, if applicable, the coolant drain plug of
the heat exchanger of the integrated
retarder.
4.
Fill the cooling system.
5.
Check the coolant level.
M2097
A
B
C
G000182
B
PE ENGINE COOLING SYSTEM
7-4
©
200324
Cleaning
6
CF65/75/85 series
2
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст