Mitsubishi Grandis. Manual — part 767
TROUBLESHOOTING
MULTIPORT FUEL INJECTION (MPI)
13A-319
DIAGNOSIS PROCEDURE
STEP 1. Connector check: C-110 engine-ECU
<M/T> connector or engine-ECU <A/T> or
engine-ECU
Q: Is the check result normal?
YES :
Go to Step 2 .
NO :
Repair or replace.
STEP 2. Check at C-110 engine-ECU <M/T>
connector or engine-A/T-ECU <A/T> connector.
• Disconnect connector, and measure at harness
side.
• Ignition switch: ON
• Short-circuit terminal No. 17 to earth.
OK: Fan motor stops rotating.
Q: Is the check result normal?
YES :
Go to Step 3 .
NO :
Go to Step 4 .
STEP 3. Check the trouble symptoms.
Q: Does trouble symptom persist?
YES :
Replace engine-ECU <M/T> or
engine-A/T-ECU <A/T>.
NO :
Intermittent malfunction (Refer to GROUP
00
− How to Use
Troubleshooting/Inspection Service Points
).
AK305618AB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Connector: C-110
<L.H. drive vehicles>
<R.H. drive vehicles>
C-110 (GR)
C-110 (GR)
Harness side connector
AK305618AB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Connector: C-110
<L.H. drive vehicles>
<R.H. drive vehicles>
C-110 (GR)
C-110 (GR)
Harness side connector
TROUBLESHOOTING
MULTIPORT FUEL INJECTION (MPI)
13A-320
STEP 4. Perform voltage measurement at C-110
engine-ECU <M/T> connector.
• Disconnect connector, and measure at harness
side.
• Ignition switch: ON
• Voltage between terminal No. 17 and earth.
OK: 4.9
− 5.1 V
Q: Is the check result normal?
YES :
Replace fan controller.
NO :
Go to Step 5 .
STEP 5. Connector check: A-26 fan controller
connector
Q: Is the check result normal?
YES :
Go to Step 6 .
NO :
Repair or replace.
STEP 6. Check harness between A-26 (terminal
No. 2) fan controller connector and C-110
(terminal No. 17) engine-ECU <M/T> connector.
NOTE: Before checking harness, check intermediate
connector A-16, and repair if necessary.
• Check output line for open circuit.
Q: Is the check result normal?
YES :
Replace fan controller.
NO :
Repair.
AK305618AB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Connector: C-110
<L.H. drive vehicles>
<R.H. drive vehicles>
C-110 (GR)
C-110 (GR)
Harness side connector
AK300999
1
2
3
AC
Harness side connector
Connector: A-26
A-26 (GR)
AK300999
1
2
3
AC
Harness side connector
Connector: A-26
A-26 (GR)
AK305618AB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Connector: C-110
<L.H. drive vehicles>
<R.H. drive vehicles>
C-110 (GR)
C-110 (GR)
Harness side connector
TROUBLESHOOTING
MULTIPORT FUEL INJECTION (MPI)
13A-321
Inspection Procedure 22: Engine-ECU <M/T> or Engine-A/T-ECU <A/T> Power Supply, Engine Control
Relay, Ignition Switch-IG1 System
AK305578
1
2
3
4
41 42 43
50 51
5253
545556
57 58
33 34
31
353637383940
444546474849
32
1 2 3
4 5 6
1 2
3 4
5 6 7
11
10
9
8
B-15X
C-111
(MU803803)
C-115
(MU801850)
IG2
ST
R
LOCK
ACC
IG1
9
20A
8
7.5A
Fusible link (26)
Ignition switch
2
28
J/B
50
C-18
C-205
C-202
6
58
Engine
control
relay
4
3
1
11
1
2
57
Battery
backup
43
34
42
33
9
B
B
B
10
11
J/C (4)
C-116
Power
source
2
1
A-16
3
A-16
Relay box
W
W
W-G
W-G
W-G
W-G
W-G
L-B
L-B
L-B
Y-G
R-W
R-W
R-W
Power supply and ignition switch-IG circuit
AB
Wire colour code
B: Black LG: Light green G: Green L: Blue W: White Y: Yellow SB: Sky blue BR: Brown O: Orange GR: Gray
R: Red P: Pink V: Violet
Engine-ECU <M/T> or
engine-A/T-ECU <A/T>
C-307
TROUBLESHOOTING
MULTIPORT FUEL INJECTION (MPI)
13A-322
OPERATION
• The battery voltage is applied to the engine
control relay (terminal No. 3 and 4).
• The engine-ECU <M/T> or engine-A/T-ECU
<A/T> (terminal No. 57) makes the power
transistor in the unit be in "ON" position and
makes currents go on the engine control relay
coil, and that makes the relay be in "ON" position.
• When the engine control relay is in "ON" position,
the battery voltage is supplied to the engine-ECU
<M/T> or engine-A/T-ECU <A/T> (terminal No.
34 and No. 43), the sensor and the actuator from
the engine control relay (terminal No. 1).
FUNCTION
• When the ignition switch ON signal is input to the
engine-ECU <M/T> or engine-A/T-ECU <A/T>,
the engine-ECU <M/T> or engine-A/T-ECU
<A/T> places the engine control relay in the ON
position. Accordingly, the battery voltage is
supplied to the engine-ECU <M/T> or
engine-A/T-ECU <A/T>, sensor and actuator.
PROBABLE CAUSE
• Failed engine control relay
• Open/short circuit in engine control relay circuit or
loose connector contact
• Failed engine-ECU <M/T>
• Failed engine-A/T-ECU <A/T>
DIAGNOSIS PROCEDURE
STEP 1. Check battery voltage.
• Measure battery voltage during cranking.
OK: 8 V or more
Q: Is the check result normal?
YES :
Go to Step 2 .
NO :
Check battery (Refer to GROUP 54A
−
Battery
− On-vehicle Service − Battery test
STEP 2. Connector check: B-15X engine control
relay connector
Q: Is the check result normal?
YES :
Go to Step 3 .
NO :
Repair or replace.
STEP 3. Check engine control relay.
• Check engine control relay (Refer to
Q: Is the check result normal?
YES :
Go to Step 4 .
NO :
Replace engine control relay.
STEP 4. Perform voltage measurement at B-15X
engine control relay connector.
• Remove relay, and measure at relay box side.
• Voltage between terminal No. 3 and earth, also
between terminal No. 4 and earth.
OK: System voltage
Q: Is the check result normal?
YES :
Go to Step 5 .
NO :
Check intermediate connector A-16, and
repair if necessary. If intermediate
connector is normal, check and repair
harness between B-15X (terminal No. 3 and
terminal No. 4) engine control relay
connector and battery.
• Check power supply line for
open/short circuit.
AK300967
2
1
3
4
AC
Harness side
connector
B-15X
Connector: B-15X
Relay box’s
triangle marks
AK300967
2
1
3
4
AC
Harness side
connector
B-15X
Connector: B-15X
Relay box’s
triangle marks
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст