Mitsubishi Outlander (2013+). Manual — part 251
CAMSHAFT
ENGINE MECHANICAL
11A-27
CAUTION
• When inserting special tool chain tension
release bar (MB992103) into the timing chain
case assembly inside, pay attention to the
position of the valve timing chain to avoid
damage to the valve timing chain and timing
chain tension side guide. Do not insert the
special tool MB992103 beyond its insertion
guideline.
• If unlocking the timing chain tensioner is
insufficient, the special tool MB992103 cannot
be inserted to the insertion guideline. Do not
insert the special tool MB992103 forcibly, fol-
low Step 2 again to unlock the timing chain
tensioner and insert the special tool
MB992103.
AC507118
AB
Valve timing chain
MB992103
Insertion standard line
AC509177
AC508125
AB
MB992103
MB992103
Timing chain
tensioner
Timing chain
tension side guide
Timing chain
tension
side guide
Valve timing chain
(tension side)
Camshaft
sprocket
(inlet side)
Valve timing chain
(exhaust camshaft and
camshaft sprocket
assembly side)
A
B
C
D
3. With the timing chain tensioner unlocked, insert
special tool chain tension release bar
(MB992103) from the timing chain case assembly
inside along the tension side of the valve timing
chain until the insertion guide line aligns with the
upper surface of the timing chain case assembly
(A in the figure).
CAMSHAFT
ENGINE MECHANICAL
11A-28
NOTE: With the timing chain tensioner unlocked,
insert the special tool MB992103 along the ten-
sion side of the valve timing chain, according to
the special tool MB992103 top shape. The special
too MB992103 can be inserted smoothly to the
position where the special tool MB992103 inser-
tion guideline aligns with the timing chain case
assembly top surface, and the spread timing
chain tension side guide can be hold.
4. With the special tool MB992103 inserted up to the
insertion guide line, press the special tool
MB992103 against the inlet side camshaft
sprocket (B in the figure) and spread and hold the
timing chain tension side guide (C in the figure).
5. Remove the precision flat-tipped screwdriver
unlocking the timing chain tensioner.
6. Pull up the camshaft and camshaft sprocket
assembly (exhaust side) mounting area of the
valve timing chain (D in the figure) to provide
allowance for easy installation of the camshaft
and camshaft sprocket assembly (exhaust side) to
the valve timing chain.
CAUTION
When installing the camshaft and camshaft
sprocket assembly (exhaust side), be careful not
to let the camshaft bearing which is installed to
the front cam bearing deviate from its position.
AC506752
AB
Paint markings
(exhaust side)
7. Align the exhaust side paint mark of the valve
timing chain which was put at removal with the
paint mark of the exhaust side camshaft sprocket,
and install the valve timing chain to the camshaft
sprocket.
8. Install the camshaft and camshaft sprocket
assembly (exhaust side) to the cylinder head.
9. Remove the special tool MB992103 inserted into
the timing chain case assembly inside.
>>F<< CAMSHAFT BEARING FRONT CAP
ASSEMBLY INSTALLATION
CAUTION
When the mounting bolts are tightened with the
camshaft bearing front cap tilted, the camshaft
bearing front cap is damaged. Install the cam-
shaft bearing front cap properly to the cylinder
head and camshaft.
AC511062
AB
4
3
2
1
4
3
2
1
(1)
(2)
Engine front
Camshaft
bearing
front cap
assembly
1. Install the camshaft bearing front cap to the
cylinder head, and temporarily tighten the
camshaft bearing front cap to the specified torque
in the order shown in the figure (1).
Tightening torque: 17
± 3 N⋅m
2. Tighten the camshaft bearing front cap to the
specified torque again in the order shown in the
figure (2).
Tightening torque: 30
± 2 N⋅m
3. After the camshaft bearing font cap installation,
check that the paint markings of the camshaft
sprocket and the timing chain and the timing mark
of the crankshaft pulley and the "T" mark position
of ignition timing indicator are aligned
respectively.
>>G<< ROCKER COVER ASSEMBLY
INSTALLATION
1. Remove the sealant from the joints between the
rocker cover assembly and cylinder head and
timing chain case assembly, and degrease the
surface where the sealant is applied by white
gasoline or the like.
CAMSHAFT
ENGINE MECHANICAL
11A-29
CAUTION
After the installation, until a sufficient period of
time (one hour or more) elapses, do not apply the
oil or water to the sealant application area or
start the engine.
AC506753
AE
Cylinder head
Timing chain case assembly
4 mm
4 mm
2. Apply sealant to the joint between the cylinder
head and timing chain case assembly as shown in
the figure and install the rocker cover assembly to
the cylinder head.
Specified sealant: ThreeBond 1217G or
equivalent
NOTE: Install the rocker cover assembly immedi-
ately after the application of sealant.
AC506743
AG
5
1
7
4
8
3
6
9
11
12
13
14
15
16
2
10
Engine front
3. Tighten the rocker cover assembly mounting bolts
to the specified torque in the order of number
shown in the figure.
Tightening torque: 3.0
± 1.0 N⋅m
4. Tighten again the rocker cover assembly
mounting bolts to the specified torque in the order
of number shown in the figure.
Tightening torque: 5.5
± 0.5 N⋅m
VALVE STEM SEAL
ENGINE MECHANICAL
11A-30
VALVE STEM SEAL
REMOVAL AND INSTALLATION
M1112008101787
CAUTION
* Remove and assemble the marked parts in each cylinder unit.
Pre-removal Operation
• Engine Room Under Cover Front A, B and Engine Room
Side Cover (RH) Removal (Refer to GROUP 51
− Under
Cover ).
• Engine Oil Draining (Refer to GROUP 12 − On-vehicle
Service, Engine Oil Replacement ).
• Rocker Cover Assembly Removal (Refer to
).
• Engine Oil Pan Removal (Refer to
• Valve Timing Chain Removal (Refer to
Post-installation Operation
• Valve Timing Chain Installation (Refer to
).
• Engine Oil Pan Installation (Refer to
• Valve Clearance Check (Refer to
• Rocker Cover Assembly Installation (Refer to
).
• Engine Oil Refilling (Refer to GROUP 12 − On-vehicle
Service, Engine Oil Replacement ).
• Engine Room Under Cover Front A, B and Engine Room
Side Cover (RH) Installation (Refer to GROUP 51
− Under
Cover ).
AC904692
6
3
11
AC
12
13
12 ± 1 N·m
1
4
5
10
9
12 ± 1 N·m
N
N
2
8
14*
15*
16*
17*
18*
15*
16*
17*
14*
18*
17 ± 3 N·m 30 ± 2 N·m
Apply engine oil to all
moving parts before
installation.
7
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст