Mitsubishi Outlander (2013+). Manual — part 270

AK502390

Dowel pin

AC

CAMSHAFT

ENGINE OVERHAUL

11B-34

4. Set the dowel pins of the camshaft at the

illustrated positions.

AK503813

2

E

Cap No.

1

2

6

5

2

1

6

5

AC

8

7

4

3

8

7

4

3

Identification mark

5. Install them upon checking the identification mark

so as not to misidentify cap No. and to confuse
the inlet side with the exhaust side.

Identification mark

I: Inlet side
E: Exhaust side

6. Tighten each camshaft bearing cap mounting bolt

to the specified torque of 12

± 1 N⋅m in the order

of number shown in the figure in two or three
steps.

AK503814

4

3

2

1

1

3

4

2

(1)

(2)

AC

Timing chain side

7. Tighten each front camshaft bearing cap

mounting bolt to the temporarily torque of 17

± 3

N

⋅m in the order of number shown (1).

8. Tighten each front camshaft bearing cap

mounting bolt to the specified torque of 30

± 2

N

⋅m in the order of number shown (2).

>>C<< O-RING / OIL FEEDER CONTROL
VALVE INSTALLATION

CAUTION

The O-ring must not be reused.

AK303651AE

Tape

Wind non-adhesive tape (seal tape, etc.)
around the notch of the oil passage of the oil
feeder control valve before installing the
O-ring to prevent damage. Damage to the
O-ring causes oil leakage.

1. Apply a small amount of engine oil to the O-ring of

the oil feeder control valve.

2. Install the oil feeder control valve on the cylinder

head.

3. Tighten the oil feeder control valve to the specified

torque of 10

± 2 N⋅m.

CAMSHAFT

ENGINE OVERHAUL

11B-35

INSPECTION

M1113027000961

CAMSHAFT

AK503020AC

Measure camshaft height (camshaft major axis). If
the height exceeds the limit, replace the camshaft.

Standard value:

Inlet: 43.25 mm
Exhaust: 45.00 mm

Limit:

Inlet: 42.75 mm
Exhaust: 44.50 mm

CAMSHAFT BEARING (METAL) OIL
CLEARANCE (PLASTIGAGE METHOD)

1. Thoroughly wipe oil on the outside diameter of the

camshaft and the inside diameter of the bearing.

2. Install the bearing to the camshaft.

AK503390

Plastigage

AC

3. Put straightly the Plastigage having the length of

the bearing width on the journal axis, centring the
axis.

4. Carefully install the bearing cap. Tighten the bolt

as instructed in >>B<< Bolt Installation Point.

5. Remove the bolt and the bearing cap carefully.

AK503391

Plastigage

AC

6. Measure the Plastigage whose width is most

compressed using the scale printed on the
Plastigage bag. When the measured value
deviates from the standard one, replace the
bearing.

Standard value: 0

0.032 mm

CAUTION

When the bearing is used again, be careful not to
reverse the cylinder head side and the camshaft
side at the installation.

VALVE TAPPET

0

0

3

0

.

AK703500AE

Thickness stamp

Under view

1. Check the Thickness stamp.

AK304938

AB

Wall
thickness

2. If the measured value in the table value is not in

agreement with the value in the table to the
Thickness stamp, replace the valve tappet.

There are 47 kinds of valve tappets at intervals of
0.015 mm in the range between 3.000 and 3.690
mm.

Thickness
stamp

Thickness

Thickness
stamp

Thickness

Thickness
stamp

Thickness

3.000

3.000 mm

3.240

3.240 mm

3.480

3.480 mm

3.015

3.015 mm

3.255

3.255 mm

3.495

3.495 mm

3.030

3.030 mm

3.270

3.270 mm

3.510

3.510 mm

3.045

3.045 mm

3.285

3.285 mm

3.525

3.525 mm

3.060

3.060 mm

3.300

3.300 mm

3.540

3.540 mm

3.075

3.075 mm

3.315

3.315 mm

3.555

3.555 mm

3.090

3.090 mm

3.330

3.330 mm

3.570

3.570 mm

3.105

3.105 mm

3.345

3.345 mm

3.585

3.585 mm

3.120

3.120 mm

3.360

3.360 mm

3.600

3.600 mm

3.135

3.135 mm

3.375

3.375 mm

3.615

3.615 mm

3.150

3.150 mm

3.390

3.390 mm

3.630

3.630 mm

3.165

3.165 mm

3.405

3.405 mm

3.645

3.645 mm

3.180

3.180 mm

3.420

3.420 mm

3.660

3.660 mm

3.195

3.195 mm

3.435

3.435 mm

3.675

3.675 mm

3.210

3.210 mm

3.450

3.450 mm

3.690

3.690 mm

3.225

3.225 mm

3.465

3.465 mm

CAMSHAFT

ENGINE OVERHAUL

11B-36

CYLINDER HEAD AND VALVES

ENGINE OVERHAUL

11B-37

CYLINDER HEAD AND VALVES

REMOVAL AND INSTALLATION

M1113006903463

AK703803

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

35 ± 2 N·m

AD

21

Apply engine oil to
all moving parts
before installation.

+90˚ +90˚

35 ± 2 N·m +90˚ +90˚

Removal steps

>>D<<

1. Cylinder head bolt

>>D<<

2. Cylinder head bolt washer

>>D<<

3. Cylinder head bolt & washer

assembly

>>C<<

4. Cylinder head assembly

>>C<<

5. Cylinder head gasket
6. Oil feeder control valve (OCV) filter

<<A>>

>>B<<

7. Retainer lock
8. Valve spring retainer
9. Valve spring
10. Inlet valve

<<A>>

>>B<<

11. Retainer lock
12. Valve spring retainer
13. Valve spring
14. Exhaust valve

<<B>>

>>A<<

15. Valve stem seal

<<B>>

>>A<<

16. Valve stem seal
17. Inlet valve guide
18. Exhaust valve guide
19. Inlet valve seat
20. Exhaust valve seat
21. Cylinder head

Removal steps (Continued)

Была ли эта страница вам полезна?
Да!Нет
4 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности