Mitsubishi Galant. Manual — part 685
SWS DIAGNOSIS
TSB Revision
SIMPLIFIED WIRING SYSTEM (SWS)
54B-135
CIRCUIT OPERATION
When the passing switch is on or the front-ECU is
illuminating the headlights (high-beam), the ETACS-
ECU illuminates the high-beam indicator light.
TECHNICAL DESCRIPTION (COMMENT)
If the headlights (high-beam and passing) operate
normally, the combination meter (high-beam
indicator light bulb or printed-circuit board), the front-
ECU or the ETACS-ECU is suspected to be
defective.
TROUBLESHOOTING HINTS
•
Malfunction of the combination meter (high-beam
indicator light bulb or printed-circuit board)
•
Malfunction of the front-ECU
•
Malfunction of the ETACS-ECU
•
Damaged harness wires or connectors
DIAGNOSIS
Required Special Tool:
•
MB991223: Test Harness Set
STEP 1. Check the headlights (high-beam and passing)
operation.
Q: Do the headlights (high-beam and passing) illuminate
normally?
YES : Go to Step 2.
NO : Solve the problem first. Refer to
.
AC003079 AB
CONNECTOR
BLOCK (LH)
CONNECTOR: C-66
AC003082AL
CONNECTORS: C-78, C-82
C-78
JUNCTION BLOCK
(FRONT VIEW)
C-82
AC003080AF
JUNCTION BLOCK
(REART VIEW)
CONNECTOR: C-85
SWS DIAGNOSIS
TSB Revision
SIMPLIFIED WIRING SYSTEM (SWS)
54B-136
STEP 2. Check the high-beam indicator light circuit at the
ETACS-ECU connector C-82.
(1)Disconnect the ETACS-ECU connector C-82 and measure
at the harness side.
(2)Connect terminal 53 to the ground.
Q: Does the high-beam indicator light illuminate?
YES : Go to Step 10.
NO : Go to Step 3.
STEP 3. Check the high-beam indicator light bulb.
Q: Is the high-beam indicator light bulb in good condition?
YES : Go to Step 4.
NO : Replace it. The high-beam indicator light should work
normally.
STEP 4. Check the combination meter (printed-circuit
board).
(1)Remove the combination meter.
(2)Remove the high-beam indicator light bulb. Then measure
the resistance between the bulb terminals.
(3)Install the bulb to the combination meter, and then measure
the resistance between connector C-29 terminal 22 and 23.
The resistance reading at this time should be much the
same as the resistance measured at Step (2).
Q: Are the two resistance values extremely different each
other?
YES : Repair or replace the combination meter (printed
circuit board). The high-beam indicator light should
work normally.
NO (much the same) : Go to Step 5.
AC002138
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
AC
CONNECTOR C-82
(HARNESS SIDE)
AC003171 AC
HIGH-BEAM INDICATOR LIGHT
AC003170
CONNECTOR C-29
(COMBINATION METER SIDE)
AB
SWS DIAGNOSIS
TSB Revision
SIMPLIFIED WIRING SYSTEM (SWS)
54B-137
STEP 5. Check the combination meter power supply circuit
at the combination meter connector C-29.
(1)Disconnect the combination meter connector C-29 and
measure at the harness side.
(2)Measure the voltage between terminal 23 and ground.
Q: Is the voltage approximately 12 volts (battery positive
voltage)?
YES : Go to Step 8.
NO : Go to Step 6.
STEP 6. Check combination meter connector C-29 for
damage.
Q: Is combination meter connector C-29 in good
condition?
YES : Go to Step 7.
NO : Repair or replace it. Refer to GROUP 00E, Harness
Connector Inspection
. The high-beam
indicator light should work normally.
AC003173AB
CONNECTOR C-29
(HARNESS SIDE)
AC003089 AD
CONNECTOR: C-29
SWS DIAGNOSIS
TSB Revision
SIMPLIFIED WIRING SYSTEM (SWS)
54B-138
STEP 7. Check the harness wires between combination
meter connector C-29 and fusible link (1).
AC002299 AC
FUSIBLE LINK (1)
AC003089 AD
CONNECTOR: C-29
AC003082 AF
JUNCTION BLOCK
(FRONT VIEW)
CONNECTOR: C-78
AC003080AF
JUNCTION BLOCK
(REART VIEW)
CONNECTOR: C-85
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст