Mitsubishi Eclipse / Eclipse Spyder (2000-2002). Service and repair manual — part 611
POWER STEERING OIL PUMP ASSEMBLY
TSB Revision
POWER STEERING
37A-39
ASSEMBLY SERVICE POINTS
>>A<< O-RING INSTALLATION
>>B<< ROTOR INSTALLATION
Install the rotor to the pulley assembly so that the rotor's punch
mark is at the pump cover side.
>>C<< CAM RING INSTALLATION
Install the cam ring with the punch mark facing the side plate.
>>D<< VANE INSTALLATION
Install the vanes on the rotor, paying close attention to the
installation direction.
INSPECTION
M1372005500073
•
Check the valve subassembly for clogging.
•
Check the driveshaft assembly for wear or damage.
•
Check the rotor and vane groove for "stepped" wear.
•
Check the contact surface of cam ring and vanes for
"stepped" wear.
•
Check the vanes for damage.
NO.
ID
×
WIDTH mm (in)
1
13.3
×
1.6 (0.52
×
0.06)
2
15 .0
×
2.0 (0.59
×
0.08)
AC001015AB
1
2
SUCTION PIPE
SIDE PLATE (REAR)
AC000753 AB
PUNCH MARK
AC000754AC
PUNCH MARK
AC000755 AC
VANE
ROTOR
CAM RING
DIRECT ROUND EDGE
TO THE CAM RING
POWER STEERING HOSES
TSB Revision
POWER STEERING
37A-40
PO W ER STEERIN G HO SES
REMOVAL AND INSTALLATION
M1372005700077
Pre-removal Operation
•
Power Steering Fluid Draining (Refer to
Post-installation Operation
•
Power Steering Fluid Level Check (Refer to
.)
•
Power Steering Fluid Line Bleeding (Refer to
AC001019
1
13
12
11
10
9
8
7
6
5
4
3
2
14
15
57 ± 7 N·m
42 ± 5 ft-lb
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
34 ± 5 N·m
26 ± 3 ft-lb
15 ± 3 N·m
11 ± 2 ft-lb
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
<2.4L ENGINE>
AB
10
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
REMOVAL STEPS
>>F<<
1.
RETURN HOSE
>>E<<
2.
SUCTION HOSE
3.
OIL RESERVOIR
>>D<<
4.
RETURN HOSE
5.
RETURN TUBE
>>C<<
6.
PRESSURE HOSE
7.
O-RING
8.
BRACKET
9.
CLAMP
10.
CLIP
>>B<<
11.
RETURN HOSE ASSEMBLY
>>A<<
12.
PRESSURE TUBE ASSEMBLY
13.
O-RING
•
FRONT BUMPER (REFER TO
GROUP 51, FRONT BUMPER
14.
CLIP
15.
COOLER TUBE ASSEMBLY
REMOVAL STEPS (Continued)
POWER STEERING HOSES
TSB Revision
POWER STEERING
37A-41
AC001020
1
13
12
11
10
9
8
7
6
5
4
3
2
57 ± 7 N·m
42 ± 5 ft-lb
12 ± 2 N·m
100 ± 22 in-lb
15 ± 3 N·m
11 ± 2 ft-lb
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
AB
8
8
12 ± 2 N·m
100 ± 22 in-lb
12 ± 2 N·m
100 ± 22 in-lb
<3.0L ENGINE>
REMOVAL STEPS
>>F<<
1.
RETURN HOSE
>>E<<
2.
SUCTION HOSE
3.
OIL RESERVOIR
>>D<<
4.
RETURN HOSE
5.
RETURN TUBE
>>C<<
6.
PRESSURE HOSE
7.
O-RING
8.
CLIP
>>B<<
9.
RETURN HOSE ASSEMBLY
>>A<<
10.
PRESSURE TUBE ASSEMBLY
11.
O-RING
•
FRONT BUMPER ASSEMBLY
(REFER TO GROUP 51, FRONT
BUMPER
12.
CLIP
13.
COOLER TUBE ASSEMBLY
REMOVAL STEPS (Continued)
POWER STEERING HOSES
TSB Revision
POWER STEERING
37A-42
INSTALLATION SERVICE POINTS
>>A<< PRESSURE TUBE ASSEMBLY INSTALLATION
Align the marks on the pressure tube assembly and steering
gear box, and install the pressure tube assembly.
>>B<< RETURN HOSE ASSEMBLY INSTALLATION
1. Align the marks on the return hose assembly and steering
gear box, and install the return hose assembly.
2. Install the return hose assembly so that the marking is
positioned as shown in the illustration.
AC001021
<3.0L ENGINE>
AB
<2.4L ENGINE>
AC001022
<3.0L ENGINE>
AB
<2.4L ENGINE>
AC001023 AB
RETURN HOSE
ASSEMBLY
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст