Mitsubishi Galant (2004+). Manual — part 759
MANUAL A/C DIAGNOSIS
TSB Revision
HEATER, AIR CONDITIONING AND VENTILATION
55A-175
STEP 2. Measure the voltage at A/C-ECU connector C-10.
(1) Disconnect A/C-ECU connector C-10 and measure the
voltage at the harness side.
(2) Turn the ignition switch to the "ON" position.
(3) Measure the voltage between terminal 16 and ground.
• The measured value should be approximately 12 volts
(battery positive voltage).
Q: Is the measured voltage approx. 12 volts?
YES : Go to Step 4.
NO : Go to Step 3.
STEP 3. Check the wiring harness between A/C-ECU
connector C-10 (terminal 16) and the ignition switch (IG2).
AC305233AW
CONNECTOR: C-10
HARNESS SIDE
C-10 (B)
AC209365
CONNECTOR C-10
(HARNESS SIDE)
HC
AC305233AW
CONNECTOR: C-10
HARNESS SIDE
C-10 (B)
MANUAL A/C DIAGNOSIS
TSB Revision
HEATER, AIR CONDITIONING AND VENTILATION
55A-176
NOTE: Also check joint connector C-03, junction block connec-
tors C-211 and C-215 for loose, corroded, or damaged termi-
nals, or terminals pushed back in the connector. If joint
connector C-03, junction block connector C-211 or C-215 is
damaged, repair or replace the connector as described in
GROUP 00E, Harness Connector Inspection
Q: Is the wiring harness between A/C-ECU connector C-10
(terminal 16) and the ignition switch (IG2) in good
condition?
YES : It can be assumed that this malfunction is intermittent.
Refer to GROUP 00, How to Use
Troubleshooting/Inspection Service Points
NO : Repair the wiring harness. Check that the air
conditioning works normally.
AC305231BP
CONNECTOR: C-03
AC305416
CONNECTORS: C-211, C-215
JUNCTION BLOCK
(FRONT VIEW)
C-215
C-211
HARNESS SIDE
C-211
HARNESS SIDE
C-215
AK
MANUAL A/C DIAGNOSIS
TSB Revision
HEATER, AIR CONDITIONING AND VENTILATION
55A-177
STEP 4. Measure the voltage at A/C-ECU connector C-10.
(1) Disconnect A/C-ECU connector C-10 and measure the
voltage at the harness side.
(2) Turn the ignition switch to the "ACC" position.
(3) Measure the voltage between terminal 7 and ground.
• The measured value should be approximately 12 volts
(battery positive voltage).
Q: Is the measured voltage approx. 12 V?
YES : Go to Step 6.
NO : Go to Step 5.
STEP 5. Check the wiring harness between A/C-ECU
connector C-10 (terminal 7) and the ignition switch (ACC).
AC305233AW
CONNECTOR: C-10
HARNESS SIDE
C-10 (B)
AC209365HD
CONNECTOR C-10
(HARNESS SIDE)
AC305233AW
CONNECTOR: C-10
HARNESS SIDE
C-10 (B)
MANUAL A/C DIAGNOSIS
TSB Revision
HEATER, AIR CONDITIONING AND VENTILATION
55A-178
NOTE: Also check joint connector C-03 and intermediate con-
nector C-29 for loose, corroded, or damaged terminals, or ter-
minals pushed back in the connector. If joint connector C-03 or
intermediate connector C-29 is damaged, repair or replace the
connector as described in GROUP 00E, Harness Connector
Inspection
.
Q: Is the wiring harness between A/C-ECU connector C-10
(terminal 7) and the ignition switch (ACC) in good
condition?
YES : It can be assumed that this malfunction is intermittent.
Refer to GROUP 00, How to Use
Troubleshooting/Inspection Service Points
NO : Repair the wiring harness. Check that the air
conditioning works normally.
STEP 6. Measure the voltage at A/C-ECU connector C-10.
(1) Disconnect A/C-ECU connector C-10 and measure the
voltage at the harness side.
(2) Measure the voltage between terminal 8 and ground.
• The measured value should be approximately 12 volts
(battery positive voltage).
Q: Is the measured voltage approx. 12 volts?
YES : Go to Step 8.
NO : Go to Step 7.
AC305232
CONNECTORS: C-03, C-29
C-29
C-29
C-03
C-03
AT
AC305233AW
CONNECTOR: C-10
HARNESS SIDE
C-10 (B)
AC209365
CONNECTOR C-10
(HARNESS SIDE)
HE
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст