Mitsubishi Galant 9G. Manual — part 596
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <2.4L ENGINE>
11B-56
9. Check that the piston moves smoothly.
.
>>B<< OIL RING INSTALLATION
1. Fit the oil ring spacer into the piston ring groove.
CAUTION
Do not use a piston ring expander when installing the side
rail.
2. Install the upper side rail.
To install the side rail, first fit one end of the rail into the
piston groove, then press the remaining portion into position
by hand. See illustration.
NOTE: The side rails and spacer may be installed in either
direction.
NOTE: New spacers and side rails are colored for identifica-
tion of their sizes.
3. Install the lower side rail in the same manner as described in
step 2.
4. Make sure that the side rails move smoothly in both
directions.
.
>>C<< PISTON RING NUMBER 2/PISTON RING
NUMBER 1 INSTALLATION
1. Using the piston ring expander, fit number 2 into the number
2 groove of piston.
NOTE: Install piston rings with identification mark facing up,
to the piston crown side.
AK301796
SIZE
IDENTIFICATION
COLOR
Standard
None
0.50 mm (0.020 in)
oversize diameter
Red
AK300190
SIDE RAIL END
AC
AK300395AD
UPPER
SIDE RAIL
SPACER
LOWER
SIDE RAIL
AK300191
PISTON RING
EXPANDER
AC
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <2.4L ENGINE>
11B-57
2. Install the number 1 piston ring in the same manner as step
1.
Identification mark:
Number 1 ring: 1R
Number 2 ring: 2R
NOTE: Confirm the profile for No.1 and No.2 piston rings
carefully. Install them correctly by paying careful attention to
the direction of the top and bottom.
NOTE: The identification mark and the size mark are
stamped on the upper plane of the piston ring (piston top
side).
3. To prevent incorrect installation, check the identification
mark of each piston ring. The identification mark is stamped
near the ring gap.
.
>>D<< CONNECTING ROD BEARING
INSTALLATION
1. Measure the crankshaft pin diameter and confirm its
classification from the following table. On a crankshaft
supplied as a service part, identification marks of its pins are
stamped at the positions shown in the illustration.
2. If the crankshaft pin outside diameter identification mark is
"I," for example, select a bearing whose identification mark
is "1."
If there is no identification color paint on the crankshaft,
measure the pin outside diameter and select a bearing
appropriate for the measured value.
3. Install the selected bearing in the big end and in the cap of
the connecting rod.
.
SIZE
SIZE MARK
Standard
None
0.50 mm (0.020 in)
oversize diameter
50
AK301452AC
No.1
No.2
CRANKSHAFT PIN OUTSIDE
DIAMETER
CONNECTING
ROD BEARING
IDENTIFICAT
ION MARK
SIZE mm (in)
IDENTIFICATI
ON MARK
I
44.995
− 45.000
(1.7715
− 1.7717)
1
II
44.985
− 44.995
(1.7711
− 1.7715)
2
III
44.980
− 44.985
(1.7709
− 1.7711)
3
AK202909
No. 3
No. 1
No. 2
No. 4
AD
IDENTIFICATION MARK OF CRANKSHAFT
PIN DIAMETER
AK300397
IDENTIFICATION
MARK POSITION
AE
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <2.4L ENGINE>
11B-58
>>E<< PISTON AND CONNECTING ROD
INSTALLATION
1. Apply engine oil to the circumference of the piston, piston
rings, and oil ring.
2. Arrange the piston ring and oil ring gaps (side rail and
spacer) as shown in the illustration.
3. Rotate the crankshaft so that the crank pin is on the center
of the cylinder bore.
4. Use suitable thread protectors on the connecting rod bolts
before inserting the piston and connecting rod assembly into
the cylinder block.
Care must be taken not to nick the crank pin.
5. Insert the piston and connecting rod assembly into the
cylinder with the front mark on the piston crown pointing to
the timing belt side.
6. Using a suitable piston ring compressor tool, install the
piston and connecting rod assembly into the cylinder block.
.
>>F<< CONNECTING ROD CAP INSTALLATION
1. Verifying the mark made during disassembly, install the
bearing cap to the connecting rod. If the connecting rod is
new with no index mark, make sure that the bearing locking
notches are on the same side as shown.
2. Make sure that the connecting rod big end side clearance
meets the specification.
Standard value: 0.10
− 0.25 mm (0.004 − 0.009 inch)
Limit: 0.4 mm (0.015 inch)
.
AK301459
UPPER SIDE
RAIL
NO. 1
TIMING
BELT
SIDE
LOWER
SIDE RAIL
NO. 2 RING GAP
AND SPACER GAP
AC
PISTON PIN
AK300192
AK300193
NOTCHES
CYLINDER
NUMBER
AC
AK300194
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <2.4L ENGINE>
11B-59
>>G<< CONNECTING ROD CAP NUT
TIGHTENING
1. The connecting rod bolts should be examined before reuse.
If the bolt threads are damaged, the bolt should be replaced.
Hand-thread the nut to the full length of the bolt threads. If
the nut does not run down smoothly, the bolt should be
replaced.
2. Before installing each nut, apply engine oil to the threaded
portion and bearing surface of the nut.
3. Loosely tighten each nut to the bolt.
4. Then tighten the nuts alternately to the specified torque to
install the cap properly.
Tightening torque: 20
± 2 N⋅m (14 ± 1 ft-lb)
5. Make a paint mark on the head of each nut.
6. Make a paint mark on the bolt end at the position 90 to 94
degrees from the paint mark made on the nut in the direction
of tightening the nut.
CAUTION
• If the nut is turned less than 90 degrees, proper fasten-
ing performance may not be achieved. Be careful to
tighten the nut exactly 90 degrees.
• If the nut is overtightened (exceeding 94 degrees),
loosen the nut completely and then retighten it by
repeating the tightening procedure from step 3.
7. Turn the nut 90 to 94 degrees and make sure that the paint
marks on the nut and bolt are aligned.
INSPECTION
M1113008500503
.
PISTON
Replace the piston if scratches or seizure is evident on its sur-
faces (especially the thrust surface). Replace the piston if it is
cracked.
.
PISTON PIN
1. Insert the piston pin into the piston pin hole with your thumb.
You should feel a slight resistance. Replace the piston pin if
it can be easily inserted or there is an excessive play.
2. The piston and piston pin must be replaced as an assembly.
.
PISTON RING
1. Check the piston ring for damage, excessive wear, and
breakage. Replace if defects are evident. If the piston has
been replaced, the piston rings must also be replaced.
AK301477AC
PAINT MARK
PAINT
MARK
NUT
BOLT
90˚ TO 94˚
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст