Mitsubishi Galant 9G. Manual — part 613
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <3.8L ENGINE>
11D-50
4. Insert the piston and connecting rod assembly into the
cylinder with the front mark on the piston crown pointing to
the timing belt side.
5. Using a suitable piston ring compressor tool, install the
piston and connecting rod assembly into the cylinder block.
.
>>F<< CONNECTING ROD CAP INSTALLATION
1. Verifying the mark made during disassembly, install the
bearing cap to the connecting rod. If the connecting rod is
new with no index mark, make sure that the bearing locking
notches are on the same side as shown.
2. Make sure that the connecting rod big end side clearance
meets the specification.
Standard value: 0.10
− 0.25 mm (0.004 − 0.009 inch)
Limit: 0.4 mm (0.02 inch)
.
AK201081AB
FRONT MARK
AKX00721
AKX00735
CYLINDER NO.
NOTCHES
AB
AK201530
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <3.8L ENGINE>
11D-51
>>G<< CONNECTING ROD CAP NUT
INSTALLATION
1. The connecting rod bolts should be examined before reuse.
If the bolt threads are damaged, the bolt should be replaced.
Hand-thread the nut to the full length of the bolt threads. If
the nut does not run down smoothly, the bolt should be
replaced.
2. Before installation of each nut, apply engine oil to the
threaded portion and bearing surface of the nut.
3. Loosely tighten each nut to the bolt.
4. Then tighten the nuts alternately to a torque of 27
± 2 N⋅m
(20
± 1 ft-lb) to install the cap properly.
5. Make a paint mark on the head of each nut.
CAUTION
• If the nut is turned less than 90 degrees, proper fasten-
ing performance may not be achieved. Be careful to
tighten the nut exactly 90 degrees.
• If the nut is overtightened (exceeding 94 degrees),
loosen the nut completely and then retighten it by
repeating the tightening procedure from step 3.
6. Make a paint mark on the bolt end at a position 90 to 94
degrees from the paint mark made on the nut in the direction
of tightening the nut.
7. Turn the nut another 90 to 94 degrees and make sure that
the paint marks on the nut and bolt are aligned.
INSPECTION
M1113008500440
.
PISTON
Replace the piston if scratches or seizure is evident on its sur-
faces (especially the thrust surface). Replace the piston if it is
cracked.
.
PISTON PIN
1. Insert the piston pin into the piston pin hole with a thumb.
You should feel a slight resistance. Replace the piston pin if
it can be easily inserted or there is excessive play.
2. The piston and piston pin must be replaced as an assembly.
.
AKX01401AB
90˚ TO 94˚
PAINT
MARKS
NUT
BOLT
PAINT
MARKS
PISTON AND CONNECTING ROD
TSB Revision
ENGINE OVERHAUL <3.8L ENGINE>
11D-52
PISTON RING
1. Check the piston ring for damage, excessive wear, and
breakage. Replace if defects are evident. If the piston has
been replaced with a new one, the piston rings must also be
replaced with new ones.
2. Check for clearance between the piston ring and ring
groove. If the limit is exceeded, replace the ring or piston, or
both.
Standard value:
Number 1: 0.03
− 0.07 mm (0.0012 − 0.0027 inch)
Number 2: 0.02
− 0.06 mm (0.0008 − 0.0023 inch)
Limit: 0.1 mm (0.003 inch)
3. Insert the piston ring into the cylinder bore. Force the ring
down with a piston, the piston crown being in contact with
the ring, to correctly position it at right angles to the cylinder
wall. Then, measure the end gap with a feeler gauge.
If the ring gap is excessive, replace the piston ring.
Standard value:
Number 1: 0.25
− 0.40 mm (0.010 − 0.016 inch)
Number 2: 0.35
− 0.50 mm (0.014 − 0.020 inch)
Oil: 0.10
− 0.35 mm (0.004 − 0.014 inch)
Limit:
Number 1, Number 2: 0.8 mm (0.03 inch)
Oil: 1.0 mm (0.03 inch)
.
CRANKSHAFT PIN OIL CLEARANCE
<PLASTIC GAUGING MATERIAL METHOD>
The crankshaft oil clearance can be measured easily by using
plastic gauging material, as follows:
1. Remove oil from the crankshaft pin and the bearing inner
surface.
2. Cut plastic gauging material to the same length as the width
of the bearing and place it on the pin in parallel with its axis.
3. Install the connecting rod cap carefully and tighten the nuts
to the specified torque.
4. Carefully remove the connecting rod cap.
5. Measure the width of the smashed plastic gauging material
at its widest section by using a scale printed on the plastic
gauging material bag.
Standard value: 0.02
− 0.04 mm (0.0008 − 0.0016 inch)
Limit: 0.1 mm (0.003 inch)
AKX00612
AKX00719
PUSH IN BY
PISTON
PISTON
RING GAP
PISTON RING
AB
AKX00731AB
SCALE
CRANKSHAFT AND CYLINDER BLOCK
TSB Revision
ENGINE OVERHAUL <3.8L ENGINE>
11D-53
CRANKSHAFT AND CYLINDER BLOCK
REMOVAL AND INSTALLATION
M1113008700637
CAUTION
Do not remove the block heater unless it is damaged, because it cannot be re-used once it is
removed’.
Required Special Tool:
• MD998718: Crankshaft Rear Oil Seal Installer
AK302900AB
1
2
4
3
6
5
13
14
16
12
11
10
9
8
7
23 ± 2 N·m
17 ± 1 ft-lb
74 ± 4 N·m
54 ± 3 ft-lb
74 ± 1 N·m
54 ± 1 ft-lb
28 ± 2 N·m
21 ± 1 ft-lb
11 ± 1 N·m
97 ± 9 in-lb
11 ± 1 N·m
97 ± 9 in-lb
APPLY ENGINE OIL
TO ALL MOVING
PARTS BEFORE
INSTALLATION.
15
2.6 ± 0.2 N·m
23 ± 1 in-lb
REMOVAL STEPS
1. ADAPTER PLATE
2. DRIVE PLATE
3. REAR PLATE
>>G<<
4. OIL SEAL CASE ASSEMBLY
>>F<<
5. CRANKSHAFT REAR OIL SEAL
6. OIL SEAL CASE
>>E<<
7. BEARING CAP BOLT
>>E<<
8. BEARING CAP
>>C<<
9. CRANKSHAFT BEARING, LOWER
10. CRANKSHAFT
>>D<<
11. THRUST BEARING
>>C<<
12. CRANKSHAFT BEARING, UPPER
13. KNOCK SENSOR
>>B<<
14. KNOCK SENSOR BRACKET
>>A<<
15. BLOCK HEATER
16. CYLINDER BLOCK
REMOVAL STEPS (Continued)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст