Mitsubishi Evolution X. Manual — part 205

AK600791

No. 2

No. 1

Identification mark

AC

PISTON AND CONNECTING ROD

TSB Revision

ENGINE OVERHAUL

11B-67

Identification mark

No. 1 ring: 1R
No. 2 ring: 2R

NOTE: Each of the available piston rings has a size mark as
follows:

Size

Size mark

Standard

No mark

0.25 mm (0.010 inch)
oversize

25

.

>>D<< PISTON CONNECTING ROD ASSEMBLY
INSTALLATION

1. Apply a sufficient amount of engine oil to the circumference

of the piston, piston rings and oil ring.

AK400403

No.1

Side rail

Side rail

AC

Piston pin

No.2

2. Arrange end gap positions of piston rings and oil ring (side

rail and spacer) as shown in the illustration.

3. Insert the piston and connecting rod assembly from the top

surface of the cylinder block with the front mark of the piston
top face facing toward the timing chain side.

AK502730

CAUTION

Driving it in hard causes breakage of piston rings and
damage to the crank pin.
4. Firmly tighten the piston ring with a ring band and insert the

piston and connecting rod assembly.

.

PISTON AND CONNECTING ROD

TSB Revision

ENGINE OVERHAUL

11B-68

>>E<< CONNECTING ROD BEARING
INSTALLATION

AK702193AD

No.1

No.2

No.3

No.4

Crankshaft pin identification stamp position

Crankshaft
front end

1. When replacing a connecting rod bearing, select the bearing

corresponding to the crankshaft pin outside diameter
according to the crankshaft pin identification in the table
below.

Crankshaft pin

Connecting
rod bearing

Identification
mark

Journal diameter
mm (in)

Identification
mark

1

51.966

− 51.972

(2.0459

− 2.0461)

1

2

51.960

− 51.966

(2.0457

− 2.0459)

2

3

51.954

− 51.960

(2.0454

− 2.0457)

3

2. An identification mark of a crankshaft is stamped at the

illustrated position by No.

AK700793AD

Identification
mark

3. A connecting rod bearings an identification mark at the

illustrated position.

.

>>F<< CONNECTING ROD CAP INSTALLATION

AK703289AD

Cylinder
number

Notch

1. Assemble the bearing cap on the connecting rod by aligning

it with the mark put during removal. If a new connecting rod
without a mating mark is used, assemble so that the detent
notch of the bearing is on the same side as illustrated.

AK703364

PISTON AND CONNECTING ROD

TSB Revision

ENGINE OVERHAUL

11B-69

2. Make sure that clearance of the thrust of the connecting rod

big end is appropriate.

Standard value: 0.10

0.25 mm (0.004 0.010 inch)

Limit: 0.4 mm (0.02 inch)

.

>>G<< CONNECTING ROD CAP BOLT
INSTALLATION

1. Check in the following procedure before reusing the

connecting rod bolt.

AK604589AD

20.5 mm (0.81 in)

35 mm (1.38 in)

A

B

B

X

(1) Measure the outside diameter "A."
(2) Measure the smallest outside diameter "B" within the

range "X" shown in the illustration.

(3) If the difference of outside diameter of thread exceeds

the limit, replace the connecting rod bolt.

Limit: 0.10 mm (0.004 inch)

2. Apply engine oil to the threaded portion and seat surface of

the bolt before installing it.

3. After installing each bolt and tightening it by fingers, tighten

bolts alternately to properly assemble the cap.

4. Tighten the bolt in several steps until the torque reaches 5.0

N

⋅ m (44 in-lb).

5. Tighten the bolt in several steps until the torque reaches 20

N

⋅ m (15 ft-lb).

AK502749

90˚

Paint mark

AD

Paint mark

6. Put a paint mark on the bolt head as illustrated.
7. Put a paint mark on the connecting rod at 90

° position in the

tightening direction of the bolt with reference to the paint
mark position of the bolt.

CAUTION

When the tightening angle is smaller than the specified

tightening angle, the appropriate tightening capacity
cannot be secured.

When the tightening angle is larger than the specified

tightening angle, remove the bolt to start from the
beginning again according to the procedure.

8. Tighten the bolt 90

° , and make sure that the paint mark of

the connecting rod is aligned with that of the bolt.

PISTON AND CONNECTING ROD

TSB Revision

ENGINE OVERHAUL

11B-70

INSPECTION

M1113008501788

.

PISTON RINGS

AK502751

1. Check clearance between piston rings and ring grooves. If

the limit is exceeded, replace piston rings or piston, or both.

Standard value:

No. 1 ring: 0.02

0.06 mm (0.001 0.002 inch)

No. 2 ring: 0.02

0.06 mm (0.001 0.002 inch)

Limit: 0.10 mm (0.004 inch)

AK603466

Please down ring
with piston

End gap

Piston ring

AC

2. Put piston rings into the cylinder bore, press them against

the piston top face, and push them in. After achieving
squareness, measure the end gap with a thickness gauge. If
the end gap is excessive, replace piston rings.

Standard value:

No. 1 ring: 0.18

0.28 mm (0.007 0.011 inch)

No. 2 ring: 0.28

0.43 mm (0.011 0.017 inch)

Oil ring: 0.10

0.34 mm (0.004 0.013 inch)

Limit:

No. 1 ring: 0.8 mm (0.03 inch)
No. 2 ring: 0.8 mm (0.03 inch)
Oil ring: 1.0 mm (0.04 inch)

.

CRANKSHAFT PIN OIL CLEARANCE
(PLASTIGAGE METHOD)

1. Wipe oil off the crankshaft pin and connecting rod bearing.
2. Place a plastigage in length equal to the bearing width on

the pin shaft straight in alignment with the shaft center.

AK703363AC

Plastigage

3. Carefully install the connecting rod cap and tighten bolts to

the specified torque of 5.0 N

⋅ m (44 in-lb) → 20 N⋅ m (15

ft-lb)

→ +90° .

4. Remove bolts and gently remove the connecting rod cap.

Была ли эта страница вам полезна?
Да!Нет
6 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности