Mitsubishi Space Star. Manual — part 16
ENGINE <F9Q1> –
Timing Belt
11C-19
REMOVAL SERVICE POINTS
A
ENGINE-ECU ASSEMBLY REMOVAL
Remove the engine
-
ECU assembly with the harness attached
and hold it in the location where the removal of drive belt
cannot be hindered.
B
DRIVE BELT REMOVAL
1.
Loosen the belt’s automatic pulley tensioner mounting bolt.
2.
Hook 16 mm wrench to the protrusion of the belt’s automatic
pulley tensioner and turn the belt’s automatic pulley
tensioner clockwise to remove the drive belt.
Caution
Do not use the removed drive belt again. Always make
sure to replace the used drive belt with a new one.
C
CRANKSHAFT PULLEY REMOVAL
1.
Turn the crankshaft clockwise to align the timing mark
of the camshaft sprocket with the center of the window
of the timing belt cover.
Caution
The crankshaft must always be turned clockwise.
2.
Use the special tool to hold the crankshaft pulley, loosen
the crankshaft pulley mounting bolt, and remove the
crankshaft pulley.
Caution
1.
This drive belt will get damaged. Do not use the
engine’s drive belt.
2.
Never use a damaged drive belt.
3.
When the crankshaft pulley mounting bolt is loosened,
be careful not to miss the timing mark while turning
the crankshaft pulley.
D
TIMING BELT REMOVAL
Loosen the timing belt tensioner pulley mounting nut to remove
the timing belt.
Caution
Do not use the removed timing belt again. Always replace
the used timing belt with a new one.
Belt’s automatic
pulley tensioner
Timing belt
cover
Timing mark
Window
Drive belt
MD998747
Timing belt tensioner
pulley mounting nut
ENGINE <F9Q1> –
Timing Belt
11C-20
INSTALLATION SERVICE POINTS
A
TIMING BELT INSTALLATION
1.
Turn the crankshaft clockwise to align the crankshaft
groove with the center of the two ribs of the crankshaft
closure cover. Furthermore, confirm that the timing mark
of the crankshaft sprocket is a tooth off to the left of the
perpendicular shaft in the engine.
2.
Confirm that the timing mark of the camshaft sprocket
aligns with the center of the window of the timing belt
cover.
3.
Fit the timing belt so that the lines on the belt are aligned
with the marks on the crankshaft and camshaft sprockets.
4.
Place the bolt in the timing belt tensioner pulley to tighten
the bolt so that the timing belt tension becomes the
standard value.
Use the MUT-
II
to measure the timing belt tension.
Standard value: 90
±
15 Hz
THE MEASUREMENT METHOD OF TIMING BELT
TENSION
(1) Connect the special tool (MB991668) to the MUT-
II
.
(2) Connect the MUT-
II
to the diagnosis connector.
(3) Turn the ignition switch to the on position to select
“Belt tension measurement” in the menu.
(4) Place the microphone 10 to 20 mm behind the belt
located in the center between the camshaft sprocket
and the crankshaft sprocket and hole it perpendicular
to the belt (approximate inclination of
±
15
°
or less).
Crankshaft groove
Timing mark
Ribs
Timing belt
cover
Timing mark
Window
Bolt
Bolt
MB991668
(Microphone)
15
15
ENGINE <F9Q1> –
Timing Belt
11C-21
(5) Pluck the center position of the belt between the
camshaft sprocket and the crankshaft sprocket to
measure the vibration frequency of the belt.
B
CRANKSHAFT PULLEY INSTALLATION
1.
Use the special tool to hold the crankshaft pulley as shown
in the removal procedures.
2.
Tighten the crankshaft pulley mounting bolt to 20 Nm.
3.
Place the special tool in a wrench to tighten the crankshaft
pulley mounting bolt to 115
° ±
15
°
.
MD998747
MB991614
Drive belt
ENGINE <F9Q1> –
Engine Assembly
11C-22
ENGINE ASSEMBLY
REMOVAL AND INSTALLATION
Caution
Mounting locations marked by * should be provisionally tightened, and then fully tightened when
the body is supporting the full weight of the engine.
Pre-removal and Post-installation Operation
Hood Removal and Installation
Under Cover Removal and Installation
Engine Coolant Draining and Supplying
(Refer to GROUP 14 – On-vehicle Service.)
Air Cleaner Removal and Installation
(Refer to GROUP 15.)
Inter Cooler and Inter Cooler Hose Removal and
Installation (Refer to GROUP 15.)
Front Exhaust Pipe Removal and Installation
(Refer to GROUP 15.)
Drive Belt Removal and Installation
(Refer to P.11C-8.)
Fuel Line Air Bleeding <After Installation Only>
(Refer to GROUP 13C – On-vehicle Service.)
1
2
3
4
5
5
5
5
6
6
6
7
8
9
10
11
12
12
13
14
15
16
17
Removal steps
1. Camshaft position sensor connector
2. Fuel pressure sensor connector
3. Fuel high pressure pump connector
4. Fuel temperature sensor connector
5. Fuel injector connector
6. Glow plug connector
7. Water temperature sensor
connector
8. EGR valve connector
9. A/C compressor connector
10. Alternator connector
11. Oil pressure switch connector
12. Vacuum hose connection
13. Brake booster vacuum hose
connection
14. Water hose connection
15. Heater hose connection
A
16. Fuel return hose connection
A
17. Fuel supply hose connection
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст