Dodge Ram Truck 1500-2500-3500. Manual — part 779
P0052-O2 SENSOR 2/1 HEATER CIRCUIT HIGH (CONTINUED)
3.
(K199) O2 2/1 HEATER CONTROL CIRCUIT
Ignition on, engine not running.
With the scan tool, actuate the O2 Heater Test with the Sensor har-
ness connector still disconnected.
Using a 12-volt test light connected to ground, probe the (K199) O2
2/1 Heater Control circuit in the O2 Sensor harness connector.
Does the test light illuminate brightly and flash on and off dur-
ing the actuation?
Yes
>> Go To 4
No
>> Go To 5
4.
(Z934) O2 2/1 HEATER GROUND CIRCUIT OPEN
Turn the ignition off.
Measure the resistance between an engine ground and the (Z934) O2
2/1 Heater ground circuit in the O2 Sensor harness connector.
Is the resistance below 5.0 ohms?
Yes
>> Replace the O2 Sensor.
Perform the POWERTRAIN VERIFICATION TEST. (Refer
to 9 - ENGINE - STANDARD PROCEDURE)
No
>> Repair the open in the (Z934) O2 2/1 Heater ground cir-
cuit.
Perform the POWERTRAIN VERIFICATION TEST. (Refer
to 9 - ENGINE - STANDARD PROCEDURE)
9 - 38
ENGINE - ELECTRICAL DIAGNOSTICS - 3.7L/4.7L/5.7L
DR/DH
P0052-O2 SENSOR 2/1 HEATER CIRCUIT HIGH (CONTINUED)
5.
(K199) O2 2/1 HEATER CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE
Turn the ignition off.
Disconnect the C3 PCM harness connector.
Ignition on, engine not running.
Using a 12-volt test light connected to ground, probe the (K199) O2
2/1 Heater Control circuit in the O2 Sensor harness connector.
Does the test light illuminate?
Yes
>> Repair the short to battery voltage in the (K199) O2 2/1
Heater Control circuit.
Perform the POWERTRAIN VERIFICATION TEST. (Refer
to 9 - ENGINE - STANDARD PROCEDURE)
No
>> Go To 6
6.
(K199) O2 2/1 HEATER CONTROL CIRCUIT OPEN
Turn the ignition off.
CAUTION: Do not probe the PCM harness connectors. Probing
the PCM harness connectors will damage the PCM terminals
resulting in poor terminal to pin connection. Install Miller Special
Tool #8815 to perform diagnosis.
Measure the resistance of the (K199) O2 2/1 Heater Control circuit
from the O2 Sensor harness connector to the appropriate terminal of
special tool #8815.
Is the resistance below 5.0 ohms?
Yes
>> Go To 7
No
>> Repair the open in the (K199) O2 2/1 Heater Control cir-
cuit.
Perform the POWERTRAIN VERIFICATION TEST. (Refer
to 9 - ENGINE - STANDARD PROCEDURE)
DR/DH
ENGINE - ELECTRICAL DIAGNOSTICS - 3.7L/4.7L/5.7L
9 - 39
P0052-O2 SENSOR 2/1 HEATER CIRCUIT HIGH (CONTINUED)
7.
PCM
NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal
push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and
Ground circuits.
Were there any problems found?
Yes
>> Repair as necessary.
Perform the POWERTRAIN VERIFICATION TEST. (Refer to 9 - ENGINE - STANDARD PROCEDURE)
No
>> Replace and program the Powertrain Control Module per Service Information.
Perform the POWERTRAIN VERIFICATION TEST. (Refer to 9 - ENGINE - STANDARD PROCEDURE)
9 - 40
ENGINE - ELECTRICAL DIAGNOSTICS - 3.7L/4.7L/5.7L
DR/DH
P0057-O2 SENSOR 2/2 HEATER CIRCUIT LOW
DR/DH
ENGINE - ELECTRICAL DIAGNOSTICS - 3.7L/4.7L/5.7L
9 - 41
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст