Dodge Ram Truck 1500-2500-3500. Manual — part 1767
14. Begin removal of the oil pump and reaction shaft
support assembly by tightening the front band
adjusting screw (2) until band is tight around front
clutch retainer. This will prevent retainer from
coming out with pump and possibly damaging
clutch or pump components.
15. Remove oil pump bolts.
16. Thread Slide Hammer Tools C-3752 (2) into
threaded holes in flange of oil pump housing (1).
17. Remove oil pump and reaction shaft (1) support
by bumping slide hammers outward alternately to
pull pump from case.
21 - 1000
AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION
DR/DH
18. Remove oil pump gasket (1). Note gasket position
in case for assembly reference.
19. Loosen front band adjusting screw until band is
completely loose.
20. Remove front band strut (2) and anchor (3).
21. Squeeze front band (1) together slightly and slide
band over front clutch retainer (2) and out of
case.
DR/DH
AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION
21 - 1001
22. Remove front and rear clutch assemblies (1) as a
unit.
23. Remove front band reaction pin and lever (1).
Start pin through lever and out of case bore with
drift or punch. Then use pencil magnet to with-
draw pin completely (2).
24. Remove intermediate shaft thrust washer (1). Tri-
angular shaped washer will either be on shaft pilot
hub (2) or in rear clutch retainer.
21 - 1002
AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION
DR/DH
25. Remove thrust plate (1) from intermediate shaft
hub (2).
26. Remove
intermediate
shaft-planetary
geartrain
assembly (1).
27. Loosen rear band locknut and loosen adjusting
screw 3-4 turns.
DR/DH
AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION
21 - 1003
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст