Dodge Ram Truck 1500-2500-3500. Manual — part 1767

14. Begin removal of the oil pump and reaction shaft

support assembly by tightening the front band
adjusting screw (2) until band is tight around front
clutch retainer. This will prevent retainer from
coming out with pump and possibly damaging
clutch or pump components.

15. Remove oil pump bolts.

16. Thread Slide Hammer Tools C-3752 (2) into

threaded holes in flange of oil pump housing (1).

17. Remove oil pump and reaction shaft (1) support

by bumping slide hammers outward alternately to
pull pump from case.

21 - 1000

AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION

DR/DH

18. Remove oil pump gasket (1). Note gasket position

in case for assembly reference.

19. Loosen front band adjusting screw until band is

completely loose.

20. Remove front band strut (2) and anchor (3).

21. Squeeze front band (1) together slightly and slide

band over front clutch retainer (2) and out of
case.

DR/DH

AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION

21 - 1001

22. Remove front and rear clutch assemblies (1) as a

unit.

23. Remove front band reaction pin and lever (1).

Start pin through lever and out of case bore with
drift or punch. Then use pencil magnet to with-
draw pin completely (2).

24. Remove intermediate shaft thrust washer (1). Tri-

angular shaped washer will either be on shaft pilot
hub (2) or in rear clutch retainer.

21 - 1002

AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION

DR/DH

25. Remove thrust plate (1) from intermediate shaft

hub (2).

26. Remove

intermediate

shaft-planetary

geartrain

assembly (1).

27. Loosen rear band locknut and loosen adjusting

screw 3-4 turns.

DR/DH

AUTOMATIC TRANSMISSION - 48RE - SERVICE INFORMATION

21 - 1003

Была ли эта страница вам полезна?
Да!Нет
3 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности