Dodge Caliber. Manual — part 565
STANDARD PROCEDURE - TESTING FOR A SHORT TO GROUND ON FUSES
POWERING SEVERAL LOADS
1. Refer to the wiring diagrams and disconnect or isolate all items on the suspected fused circuits.
2. Replace the blown fuse.
3. Supply power to the fuse by turning ON the ignition switch or re-connecting the battery.
4. Start connecting or energizing the items in the fuse circuit one at a time. When the fuse blows the circuit with the
short to ground has been isolated.
STANDARD PROCEDURE - TESTING FOR A VOLTAGE DROP
1. Connect the positive lead of the voltmeter to the
side of the circuit closest to the battery.
2. Connect the other lead of the voltmeter to the other
side of the switch, component or circuit.
3. Operate the item.
4. The voltmeter will show the difference in voltage
between the two points.
PM
8W-01 WIRING DIAGRAM INFORMATION
8W - 01 - 13
SPECIAL TOOLS
WIRING/TERMINAL
PROBING TOOL PACKAGE 6807
TERMINAL PICK TOOL SET 6680
TERMINAL REMOVING TOOLS 6932 AND 8638
TERMINAL REMOVING TOOL 6934
8W - 01 - 14
8W-01 WIRING DIAGRAM INFORMATION
PM
CONNECTOR
REMOVAL
1. Disconnect battery.
2. Release Connector Lock (2).
3. Disconnect the connector (3) being repaired from
its mating half/component.
4. Remove the dress cover (if applicable) (1).
PM
8W-01 WIRING DIAGRAM INFORMATION
8W - 01 - 15
5. Release the Secondary Terminal Lock, if required (1).
8W - 01 - 16
8W-01 WIRING DIAGRAM INFORMATION
PM
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст