Dodge Nitro. Manual — part 844

Fig. 113: Installing 5-6 Synchronizer Hub Detents, Springs, And Balls
Courtesy of CHRYSLER LLC

6. Remove rear housing with mainshaft, countershaft and shift rails from fixture. Set assembly on rear

housing with shafts pointing up.

7. Install 5-6 synchronizer hub (1) detents, springs, and balls (2).

2007 Dodge Nitro R/T

2007 MANUAL TRANSMISSION NSG370 - Diagnosis & Overhaul - Nitro

Fig. 114: Identifying Fifth Gear Synchronizer Friction Ring & 5-6 Synchronizer Hub
Courtesy of CHRYSLER LLC

8. Install fifth gear synchronizer friction ring (1) on 5-6 synchronizer hub (2).

2007 Dodge Nitro R/T

2007 MANUAL TRANSMISSION NSG370 - Diagnosis & Overhaul - Nitro

Fig. 115: Identifying Fifth Gear Synchronizer Blocker Ring & 5-6 Synchronizer Hub
Courtesy of CHRYSLER LLC

9. Install fifth gear blocker ring (1) on 5-6 synchronizer hub (2). Then hold blocker ring and center

synchronizer sleeve.

2007 Dodge Nitro R/T

2007 MANUAL TRANSMISSION NSG370 - Diagnosis & Overhaul - Nitro

Fig. 116: Installing Input Shaft Roller Bearing On Mainshaft
Courtesy of CHRYSLER LLC

10. Install input shaft roller bearing (1) on mainshaft (2).

2007 Dodge Nitro R/T

2007 MANUAL TRANSMISSION NSG370 - Diagnosis & Overhaul - Nitro

Была ли эта страница вам полезна?
Да!Нет
6 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности