Dodge Nitro. Manual — part 135
INSTALLATION
PUMP-OIL
Fig. 269: Crankshaft, Dowel, Gasket, Oil Pump, Front Crankshaft Seal, Crankshaft Gear & Pin
Courtesy of CHRYSLER LLC
1 - CRANKSHAFT
2 - DOWEL
3 - GASKET
4 - OIL PUMP
5 - FRONT CRANKSHAFT SEAL
6 - CRANKSHAFT GEAR
7 - PIN
2007 Dodge Nitro R/T
2007 ENGINE 4.0L - Service Information - Nitro
1. Prime oil pump (4) before installation by filling rotor cavity with clean engine oil.
2. Install oil pump (4) and gasket (3) carefully over the crankshaft. Position pump onto block and tighten
bolts to 28 N.m (250 in. lbs.).
Fig. 270: Oil Pick Up Tube With Strainer, Bolt, O-Ring, Oil Pump & Windage Tray
Courtesy of CHRYSLER LLC
1 - OIL PICK UP TUBE WITH STRAINER
2 - BOLT
3 - O-RING
4 - OIL PUMP
5 - WINDAGE TRAY
2007 Dodge Nitro R/T
2007 ENGINE 4.0L - Service Information - Nitro
3. Install new O-ring (3) on oil pickup tube (1).
4. Install oil pickup tube (1).
5. Install oil pan. (Refer to INSTALLATION )
6. Install crankshaft sprocket. (Refer to INSTALLATION )
7. Install timing belt. (Refer to INSTALLATION )
8. Install the timing belt covers. (Refer to INSTALLATION for Front and INSTALLATION for Rear )
Fig. 271: Accessory Drive Belt Routing
Courtesy of CHRYSLER LLC
9. Install the crankshaft vibration damper (4). (Refer to INSTALLATION )
10. Install the accessory drive belt (7). (Refer to INSTALLATION )
11. Fill the cooling system. (Refer to STANDARD PROCEDURE )
12. Fill engine crankcase with proper oil to the correct level.
MANIFOLDS
MANIFOLD - INTAKE
REMOVAL
1 - GENERATOR
2 - IDLER PULLEY
3 - WATER PUMP PULLEY
4 - CRANKSHAFT PULLEY
5 - ACCESSORY DRIVE BELT TENSIONER
6 - A/C COMPRESSOR
7 - ACCESSORY DRIVE BELT
2007 Dodge Nitro R/T
2007 ENGINE 4.0L - Service Information - Nitro
INTAKE MANIFOLD-LOWER
Fig. 272: Lower Intake Manifold
Courtesy of CHRYSLER LLC
1 - LOWER INTAKE MANIFOLD
2 - GASKET
2007 Dodge Nitro R/T
2007 ENGINE 4.0L - Service Information - Nitro
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст