Dodge Nitro. Manual — part 518
REMOVAL-3.7L
Fig. 45: Identifying Power Cord, Block Heater & Core Hole
Courtesy of CHRYSLER LLC
1. Drain cooling system. See STANDARD PROCEDURE.
2. Raise vehicle on hoist.
3. Detach power cord plug from heater.
1 - POWER CORD
2 - BLOCK HEATER
3 - CORE HOLE
2007 Dodge Nitro R/T
2007 ENGINE Cooling - Nitro
4. Loosen screw in center of heater. Remove heater assembly.
INSTALLATION
INSTALLATION-3.7L
Fig. 46: Identifying Power Cord, Block Heater & Core Hole
Courtesy of CHRYSLER LLC
1 - POWER CORD
2 - BLOCK HEATER
3 - CORE HOLE
2007 Dodge Nitro R/T
2007 ENGINE Cooling - Nitro
1. Thoroughly clean core hole and heater seat.
2. Insert heater assembly (2) with element loop positioned upward .
3. With heater seated, tighten center screw securely to assure a positive seal.
4. Connect power cord to heater.
5. Lower vehicle.
6. Fill cooling system. See STANDARD PROCEDURE.
SENSOR-ENGINE COOLANT TEMPERATURE
DESCRIPTION
DESCRIPTION
The Engine Coolant Temperature (ECT) sensor is used to sense engine coolant temperature. The sensor
protrudes into an engine water jacket.
The ECT sensor is a two-wire Negative Thermal Coefficient (NTC) sensor. Meaning, as engine coolant
temperature increases, resistance (voltage) in the sensor decreases. As temperature decreases, resistance
(voltage) in the sensor increases.
OPERATION
OPERATION
At key-on, the Powertrain Control Module (PCM) sends out a regulated 5 volt signal to the ECT sensor. The
PCM then monitors the signal as it passes through the ECT sensor to the sensor ground (sensor return).
When the engine is cold, the PCM will operate in Open Loop cycle. It will demand slightly richer air-fuel
mixtures and higher idle speeds. This is done until normal operating temperatures are reached.
The PCM uses inputs from the ECT sensor for the following calculations:
For engine coolant temperature gauge operation through the bus communications
Injector pulse-width
Spark-advance curves
ASD relay shut-down times
Idle Air Control (IAC) motor key-on steps
Pulse-width prime-shot during cranking
O2 sensor closed loop times
CAUTION: To prevent damage, the power cord must be secured in its retaining
clips, and not positioned so it could contact linkages or exhaust
manifold.
2007 Dodge Nitro R/T
2007 ENGINE Cooling - Nitro
Purge solenoid on/off times
EGR solenoid on/off times (if equipped)
Leak Detection Pump operation (if equipped)
Radiator fan relay on/off times (if equipped)
Target idle speed
REMOVAL
REMOVAL-3.7L ENGINE
Fig. 47: Removing/Installing MAP Sensor/ECT Sensor
Courtesy of CHRYSLER LLC
2007 Dodge Nitro R/T
2007 ENGINE Cooling - Nitro
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст