Infiniti M35/M45 Y50. Manual — part 661



DTC P0444, P0445 EVAP CANISTER PURGE VOLUME CONTROL SOLENOID

VALVE

EC-1117

[VK45DE]

C

D

E

F

G

H

I

J

K

L

M

A

EC

On Board Diagnosis Logic

NBS005HE

DTC Confirmation Procedure

NBS005HF

NOTE:
If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at
least 10 seconds before conducting the next test.
TESTING CONDITION:
Before performing the following procedure, confirm battery voltage is more than 11V at idle.

WITH CONSULT-II

1.

Turn ignition switch ON.

2.

Select “DATA MONITOR” mode with CONSULT-II.

3.

Start engine and let it idle for at least 13 seconds.

4.

If 1st trip DTC is detected, go to

EC-1120, "Diagnostic Proce-

dure"

.

WITH GST

Follow the procedure “WITH CONSULT-II” above.

DTC No.

Trouble diagnosis name

DTC detecting condition

Possible cause

P0444
0444

EVAP canister purge volume
control solenoid valve circuit
open

An excessively low voltage signal is sent
to ECM through the valve

Harness or connectors
(The solenoid valve circuit is open or
shorted.)

EVAP canister purge volume control
solenoid valve

P0445
0445

EVAP canister purge volume
control solenoid valve circuit
shorted

An excessively high voltage signal is sent
to ECM through the valve

Harness or connectors
(The solenoid valve circuit is shorted.)

EVAP canister purge volume control
solenoid valve

SEF058Y

EC-1118

[VK45DE]

DTC P0444, P0445 EVAP CANISTER PURGE VOLUME CONTROL SOLENOID

VALVE

Wiring Diagram

NBS005HG

TBWT1029E

DTC P0444, P0445 EVAP CANISTER PURGE VOLUME CONTROL SOLENOID

VALVE

EC-1119

[VK45DE]

C

D

E

F

G

H

I

J

K

L

M

A

EC

Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II.

CAUTION:

Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.

: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)

TER-

MINAL

NO.

WIRE

COLOR

ITEM

CONDITION

DATA (DC Voltage)

45

V

EVAP canister purge vol-
ume control solenoid valve

[Engine is running]

Idle speed

Accelerator pedal: Not depressed even
slightly, after engine starting

BATTERY VOLTAGE

(11 - 14V)

[Engine is running]

Engine speed: About 2,000 rpm (More than
100 seconds after starting engine)

BATTERY VOLTAGE

(11 - 14V)

111

SB

ECM relay
(Self shut-off)

[Engine is running]
[Ignition switch: OFF]

For a few seconds after turning ignition
switch OFF

0 - 1.5V

[Ignition switch: OFF]

More than a few seconds after turning igni-
tion switch OFF

BATTERY VOLTAGE
(11 - 14V)

119

120

R
R

Power supply for ECM

[Ignition switch: ON]

BATTERY VOLTAGE
(11 - 14V)

SEC990C

SEC991C

EC-1120

[VK45DE]

DTC P0444, P0445 EVAP CANISTER PURGE VOLUME CONTROL SOLENOID

VALVE

Diagnostic Procedure

NBS005HH

1.

CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE POWER SUPPLY CIR-

CUIT

1.

Turn ignition switch OFF.

2.

Disconnect EVAP canister purge volume control solenoid valve
(1) harness connector.

3.

Turn ignition switch ON.

4.

Check voltage between EVAP canister purge volume control
solenoid valve terminal 1 and ground with CONSULT-II or tester.

OK or NG

OK

>> GO TO 3.

NG

>> GO TO 2.

2.

DETECT MALFUNCTIONING PART

Check the following.

Harness connectors E108, M15

Harness connectors M72, F102

IPDM E/R harness connector E7

Harness for open or short between EVAP canister purge volume control solenoid valve and IPDM E/R

Harness for open or short between EVAP canister purge volume control solenoid valve and ECM

>> Repair open circuit or short to ground or short to power in harness or connectors.

3.

CHECK EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE OUTPUT SIGNAL CIR-

CUIT FOR OPEN AND SHORT

1.

Turn ignition switch OFF.

2.

Disconnect ECM harness connector.

3.

Check harness continuity between ECM terminal 45 and EVAP canister purge volume control solenoid
valve terminal 2. Refer to Wiring Diagram.

4.

Also check harness for short to ground and short to power.

OK or NG

OK (With CONSULT-II)>>GO TO 4.
OK (Without CONSULT-II)>>GO TO 5.
NG

>> Repair open circuit or short to ground or short to power in harness or connectors.

PBIB2688E

Voltage: Battery voltage

PBIB0148E

Continuity should exist.

Была ли эта страница вам полезна?
Да!Нет
4 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности