Infiniti Q45. Manual — part 446
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
EC-423
C
D
E
F
G
H
I
J
K
L
M
A
EC
Wiring Diagram
NBS001XE
TBWM1233E
EC-424
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
Diagnostic Procedure
NBS001XF
PROCEDURE FOR MALFUNCTION A
1.
INSPECTION START
Do you have CONSULT-II?
Yes or No
Yes
>> GO TO 2.
No
>> GO TO 3.
2.
CHECK EVAP CANISTER VENT CONTROL VALVE CIRCUIT
With CONSULT-II
1.
Turn ignition switch OFF and then turn ON
2.
Select “VENT CONTROL/V” in “ACTIVE TEST” mode with
CONSULT-II.
3.
Touch “ON/OFF” on CONSULT-II screen.
4.
Check for operating sound of the valve.
Clicking noise should be heard.
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 3.
TER-
MINAL
NO.
WIRE
COLOR
ITEM
CONDITION
DATA (DC Voltage)
111
W/B
ECM relay
(Self shut-off)
[Engine is running]
[Ignition switch: OFF]
●
For a few seconds after turning ignition
switch OFF
0 - 1.5V
[Ignition switch: OFF]
●
More than a few seconds after turning igni-
tion switch OFF
BATTERY VOLTAGE
(11 - 14V)
117
L/Y
EVAP canister vent control
valve
[Ignition switch: ON]
BATTERY VOLTAGE
(11 - 14V)
119
120
R
R
Power supply for ECM
[Ignition switch: ON]
BATTERY VOLTAGE
(11 - 14V)
PBIB1679E
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
EC-425
C
D
E
F
G
H
I
J
K
L
M
A
EC
3.
CHECK EVAP CANISTER VENT CONTROL VALVE POWER SUPPLY CIRCUIT
1.
Turn ignition switch OFF.
2.
Disconnect EVAP canister vent control valve harness connector.
3.
Turn ignition switch ON.
4.
Check voltage between EVAP canister vent control valve termi-
nal 1 and ground with CONSULT-II or tester.
OK or NG
OK
>> GO TO 5.
NG
>> GO TO 4.
4.
DETECT MALFUNCTIONING PART
Check the following.
●
Harness connectors M135, F105
●
Harness connectors M139, B209
●
Harness connectors B251, B401
●
Harness for open or short between EVAP canister vent control valve and ECM relay
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.
CHECK EVAP CANISTER VENT CONTROL VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND
SHORT
1.
Turn ignition switch OFF.
2.
Disconnect ECM harness connector.
3.
Check harness continuity between ECM terminal 117 and EVAP canister vent control valve terminal 2.
Refer to Wiring Diagram.
4.
Also check harness for short to ground and short to power.
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 6.
Voltage: Battery voltage
PBIB0026E
PBIB0152E
Continuity should exist.
EC-426
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
6.
DETECT MALFUNCTIONING PART
Check the following.
●
Harness connectors F105, M135
●
Harness connectors M141, B211
●
Harness connectors B251, B401
●
Harness for open or short between EVAP canister vent control valve and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7.
CHECK RUBBER TUBE FOR CLOGGING
1.
Disconnect rubber tube connected to EVAP canister vent control valve.
2.
Check the rubber tube for clogging.
OK or NG
OK
>> GO TO 8.
NG
>> Clean the rubber tube using an air blower.
8.
CHECK EVAP CANISTER VENT CONTROL VALVE
Refer to
EC-428, "Component Inspection"
OK or NG
OK
>> GO TO 9.
NG
>> Replace EVAP canister vent control valve.
9.
CHECK INTERMITTENT INCIDENT
Refer to
EC-145, "TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT"
.
>> INSPECTION END
PROCEDURE FOR MALFUNCTION B
1.
CHECK RUBBER TUBE
1.
Turn ignition switch OFF.
2.
Disconnect rubber tube connected to EVAP canister vent control valve.
3.
Check the rubber tube for clogging.
OK or NG
OK
>> GO TO 2.
NG
>> Clean rubber tube using an air blower.
PBIB0026E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст