Infiniti G37 Coupe. Manual — part 1014
PG
PREPARATION
PG-95
< PREPARATION >
[POWER SUPPLY&GROUND CIRCUIT]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
PREPARATION
PREPARATION
Special Service Tools
INFOID:0000000001680440
Tool number
(Kent-Moore No.)
Tool name
Description
—
(J-48087)
Battery Service Center
Tests battery.
For operating instructions, refer to Technical
Service Bulletin and Battery Service Center
User Guide.
WKIA5280E
PG-96
< ON-VEHICLE REPAIR >
[POWER SUPPLY&GROUND CIRCUIT]
BATTERY
ON-VEHICLE REPAIR
BATTERY
Exploded View
INFOID:0000000001680441
Removal and Installation
INFOID:0000000001680442
REMOVAL
1.
Remove battery cover.
2.
Remove the clips (A), and remove hoodledge cover RH (1).
3.
Remove the cowl top cover (RH). Refer to
EXT-21, "Removal and Installation"
4.
Loosen battery terminal nuts (1), and disconnect both battery
cables from battery terminals.
CAUTION:
When disconnecting, disconnect the battery cable from the
negative terminal first.
5.
Remove battery fix frame mounting nuts (2) and battery fix
frame (3).
6.
Remove battery.
INSTALLATION
Install in the reverse order of removal.
CAUTION:
When connecting, connect the battery cable to the positive terminal first.
1
: Battery fix frame
2
: Battery fix frame mounting nuts
3
: Battery terminal (-)
4
: Battery terminal (+)
JPMIA0487ZZ
JPMIA0488ZZ
JPMIA0489ZZ
Battery fix frame mounting nut
: 3.9 N·m (0.40 kg-m, 35 in-lb)
Battery terminal nut
: 5.4 N·m (0.55 kg-m, 48 in-lb)
PG
BATTERY TERMINAL WITH FUSIBLE LINK
PG-97
< ON-VEHICLE REPAIR >
[POWER SUPPLY&GROUND CIRCUIT]
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
BATTERY TERMINAL WITH FUSIBLE LINK
Exploded View
INFOID:0000000001680443
Removal and Installation
INFOID:0000000001680444
REMOVAL
1.
Disconnect the battery cable from the negative terminal.
2.
Remove cover of battery positive terminal.
3.
Remove harness mounting nuts (1) to disconnect harness con-
nector (2).
4.
Remove fusible link holder mounting nut (3) to disconnect bat-
tery terminal with fusible link (4).
INSTALLATION
Install in the reverse order of removal.
1
: Harness mounting nut
2
: Fusible link holder mounting nut
3
: Harness connector
4
: Battery terminal with fusible link
JPMIA0490ZZ
JPMIA0491ZZ
Harness mounting nut
: 13.2 N·m (1.3 kg-m, 10 ft-lb)
Fusible link holder mounting nut
: 13.2 N·m (1.3 kg-m, 10 ft-lb)
PG-98
< SERVICE DATA AND SPECIFICATIONS (SDS)
[POWER SUPPLY&GROUND CIRCUIT]
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
Battery
INFOID:0000000001680445
Type
80D23L
20 hour rate capacity
[V - Ah]
12 - 62
Cold cranking current (For reference value)
[A]
582
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст