Infiniti EX35. Manual — part 363
BRM-54
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
1.
Urethane foam
2.
Body sealing
Unit: mm (in)
: Vehicle front
: Drill
φ
8 mm (0.31 in) hole for the plug welding hole (ultra high strength steel plate).
:Perform the plug welding instead of the laser welding.
Replacement parts
l
Outer front side body (LH)
l
Front pillar brace (LH)
l
Upper rear hoodledge (LH)
l
Upper inner front pillar assembly
(LH)
JSKIA0605GB
REPLACEMENT OPERATIONS
BRM-55
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
View B: Before installing outer front side body and front pillar brace
View F: Before installing outer front side body
1.
Urethane foam
Unit: mm (in)
: Vehicle front
JSKIA0606GB
BRM-56
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
View N: Before installing outer front side body
Center Pillar
INFOID:0000000003757474
Work after roof has been removed.
1.
Urethane foam
Unit: mm (in)
: Vehicle front
: Drill
φ
8 mm (0.31 in) hole for the plug welding hole (ultra high strength steel plate).
JSKIA0607GB
REPLACEMENT OPERATIONS
BRM-57
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
View A: Before installing outer front side body
1.
Urethane foam
Unit: mm (in)
: Vehicle front
: Drill
φ
10 mm (0.39 in) hole for the plug welding hole (ultra high strength steel plate).
: Drill
φ
11 mm (0.43 in) hole for the plug welding hole (ultra high strength steel plate).
: Perform the plug welding instead of the laser welding.
Replacement parts
l
Outer front side body (LH)
l
Center pillar reinforcement (LH)
l
Inner center pillar (LH)
JSKIA0608GB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст