Volkswagen Golf / Golf GTI / Jetta. Manual — part 973
87-104
Test conditions
Making
connections
Notes:
Workshop
temperature: 20
30 C (68-86 F)
Engine at
Workshop
temperature.
The following test
procedure is only
possible on
vehicles where
the -G65- square
wave signal to the
coolant fan
control module -
J2293- is also
transmitted to the
Motronic Engine
Control Module
(ECM). Confirm
G65- circuit using
wiring diagram.
On vehicles
where -G65- is
NOT connected
to the ECM,
connect green
clip from VAG
1767 directly to
G65- pin 2 using
appropriate VAG
1594 adapter
cable -7-.
Proceed directly
to checking
Page 87-105
-
Disconnect
engine
harness
electrical
connector
A/C refrigerant system, servicing
13/2/2005
from
Engine
Control
Module
(ECM) -3
- Locate correct test
box VAG1598A
4- and adapter
according to pin
assignments of
ECM -3- and
connect test box
to engine wiring
connector/harness
-2-.
A/C refrigerant system, servicing
13/2/2005
87-105
Notes:
- Connect
black clip
from
VAG1767
to
Ground
(GND) -
5-.
- Determine
applicable -
G65- signal
input pin
assignment
to ECM
using
wiring
diagram.
Example:
T121/61
As -G65-
function
primarily
controls
coolant fan
and A/C
clutch
operation, the
engine wiring
diagrams
may indicate
the -G65-
signal
connection as
being"Coolant
fan control
module
connection".
ECM
terminal
number
assignments
correspond
with those
on test box
VAG1598A.
A/C refrigerant system, servicing
13/2/2005
Checking
- Connect
green clip
from
VAG1767 to
the
corresponding
numbered
position on
test box
VAG1598A
connected to -
G65- pin -2-
using
appropriate
VAG 1594
adapter cable
-7- .Example:
61
- Switch
ignition
on.
- Press button
(arrow) for
Duty Cycle
measurement
(modulation
ratio) on
ignition tester
VAG 1767.
A/C refrigerant system, servicing
13/2/2005
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст