Volkswagen Golf / Golf GTI / Jetta. Manual — part 64
19-19
Work sequence
- Install lower coolant hose and
secure with retaining clamp
(arrow).
Repair Manual, Body Exterior,
Repair Group 50
- Slide coolant hoses onto oil
cooler unions (arrows) and secure
with spring-type clamps.
- Install center insulation tray:
Cooling system components, servicing
19-20
Without using coolant system
charging unit VAS 6096
Using coolant system charging
unit VAS 6096
See instruction manual for coolant
system charging unit VAS 6096
With and without coolant system
charging unit VAS 6096
- Fill coolant slowly up to top mark
of hatched field on expansion
tank.
- Screw adapter V.A.G1274/8 onto
expansion tank.
- Fill coolant system using coolant
system charging unit VAS 6096:
- Seal expansion tank.
- Switch off heater and air
conditioner.
- Start engine and maintain an
engine speed of about 2000 rpm
for approx. 3 minutes.
- Allow engine to run at idling
speed until lower hose on radiator
becomes hot.
- Switch ignition off.
Cooling system components, servicing
19-21
- Check coolant level and top up
coolant if necessary:
At normal engine operating
temperature coolant level must
reach top mark of hatched field.
When engine is cold coolant level
should be around middle of
hatched field.
Cooling system components, servicing
19-22
Radiator and
coolant fan,
removing and
installing
Special tools
and equipment
T10007
Refractometer
VAG 1306
Drip tray
VAG 1331
Torque
wrench (5...50
Nm)
VAS 5024
Assembly tool
for spring-
type clips
Cooling system components, servicing
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст