Nissan X-Trail 32. Instruction — part 2019
TM-34
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
CONTROL LINKAGE
• From under the vehicle, press grommet
into place until the
pawls
securely.
CAUTION:
Check that pulling down on the grommet does not fall out it.
• Insert the each socket part
of cable until it reaches the cable
mounting bracket (M/T)
and M/T shift selector assembly
securely.
CAUTION:
Check that pulling up on the socket does not disconnect it.
• Install select cable (M/T shift selector assembly side), as per the following procedure.
When M/T shift selector assembly is replaced with new one:
1.
Install the select cable to the M/T shift selector assembly.
2.
Shift the shift lever to the neutral position.
3.
Install the lock pin
to the M/T shift selector assembly as
shown in the figure.
CAUTION:
Select cable cannot be adjusted accurately without using
the lock pin.
4.
Check that shift lever does not move in the direction of the
select. If it moves, re-install lock pin.
5.
Push the stopper
until it reaches the select cable.
6.
Remove the lock pin from M/T shift selector assembly.
7.
Shift shift lever to each gear position to check that there are no
bindings. If any, re-install select cable with lock pin.
When M/T shift selector assembly is reused or without lock pin:
1.
Install the select cable to the M/T shift selector assembly.
2.
Shift the shift lever to the 4th gear position.
JPDIC0844ZZ
JSDIA5773ZZ
JSDIA5774ZZ
JSDIA5775ZZ
CONTROL LINKAGE
TM-35
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
3.
Adjust the clearance (C) between the stopper
and the lever
to the standard value.
4.
Push the stopper
until it reaches the select cable.
5.
Shift shift lever to each gear position to check that there are no
bindings. If any, re-install select cable and re-adjust the clear-
ance.
• Perform inspection after installation. Refer to
.
Inspection
INFOID:0000000010842450
INSPECTION AFTER INSTALLATION
• When the shift lever is shifted to each position, check that the shift lever moves smoothly (no-hook up, no-
noise, no-backlash and non-contact to other parts). If any malfunction is detected, repair the malfunctioning
parts or replace cable assembly.
• When the shift lever is shifted to reverse gear side and 5th-6th side, confirm the shift lever returns to neutral
position. When the shift lever does not return to the neutral position smoothly, check M/T shift selector
assembly and select cable condition. If any malfunction is detected, repair or replace the malfunctioning
part.
Clearance
: 3.8 – 4.0 mm (0.150 – 0.157 in)
JSDIA6477ZZ
JSDIA5775ZZ
TM-36
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
POSITION SWITCH
POSITION SWITCH
Exploded View
INFOID:0000000010842451
Removal and Installation
INFOID:0000000010842452
REMOVAL
1.
Remove battery and battery trays. Refer to
PG-148, "EXCEPT FOR R9M : Removal and Installation"
.
2.
Disconnect position switch harness connector.
3.
Remove position switch
.
4.
Perform inspection after removal. Refer to
.
INSTALLATION
1.
Apply recommended sealant to threads of position switch
.
• For sealant to use, refer to
.
CAUTION:
Remove old sealant and oil adhering to threads.
Position switch
Transaxle assembly
: Vehicle front
: N·m (kg-m, ft-lb)
: Apply Genuine Liquid Gasket, Three Bond 1215 or equivalent.
JSDIA5665GB
JSDIA5917ZZ
JSDIA5918ZZ
POSITION SWITCH
TM-37
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
2.
Install position switch
.
3.
Tighten position switch to the specified torque. Refer to
4.
For the next step and after, install in the reverse order of
removal.
5.
Perform inspection after installation. Refer to
Inspection
INFOID:0000000010842453
INSPECTION AFTER REMOVAL
Check continuity between position switch terminals. Refer to
INSPECTION AFTER INSTALLATION
Check the oil leakage. Refer to
.
JSDIA5917ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст