Nissan Teana J32. Instruction — part 485
EM-64
< ON-VEHICLE REPAIR >
TIMING CHAIN
a.
Apply a continuous bead of liquid gasket with the tube presser
(commercial service tool) to front timing chain case back side as
shown in the figure.
Use Genuine Liquid Gasket or equivalent.
b.
Install front timing chain case as to fit its dowel pin hole together dowel pin on rear timing chain case.
c.
Tighten mounting bolts to the specified torque in numerical order
as shown in the figure.
• There are two types of mounting bolt. Refer to the following for
locating bolts.
d.
After all bolts tightening, retighten them to the specified torque in
numerical order as shown in the figure.
CAUTION:
Be sure to wipe off any excessive liquid gasket leaking on surface mating with oil pan (upper).
e.
After installing front timing chain case, check the surface height
difference between the following parts on the oil pan (upper)
mounting surface.
• If not within the standard, repeat the installation procedure.
13. Install intake valve timing control covers as follows:
a.
Install new seal rings in shaft grooves.
b.
Being careful not to move seal rings from the installation grooves, align dowel pins on front timing chain
case with the holes to install valve timing control covers.
D
: Bolt hole
E
: Protrusion
f
:
φ
2.6 - 3.6 mm (0.102 - 0.142 in)
JPBIA1782ZZ
M8 bolts
: 1, 2
: 28.4 N·m (2.9 kg-m, 21 ft-lb)
M6 bolts
: Except the above
: 12.7 N·m (1.3 kg-m, 9 ft-lb)
Standard
Front timing chain case to rear timing chain case:
−
0.14 to 0.14 mm (
−
0.006 to 0.006 in)
JPBIA1640ZZ
SEM943G
TIMING CHAIN
EM-65
< ON-VEHICLE REPAIR >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
c.
Tighten mounting bolts in numerical order as shown in the fig-
ure.
14. Install crankshaft pulley as follows:
a.
Install crankshaft pulley, taking care not to damage front oil seal.
• When press-fitting crankshaft pulley with a plastic hammer, tap on its center portion (not circumference).
b.
Fix crankshaft with the pulley holder (commercial service tool).
c.
Tighten crankshaft pulley bolt.
d.
Place a paint mark (A) on crankshaft pulley (1) aligning with the
angle mark (B) on crankshaft pulley bolt (2). Tighten the bolt 90
degrees (angle tightening).
15. Rotate crankshaft pulley in normal direction (clockwise when viewed from engine front) to confirm it turns
smoothly.
16. Install in the reverse order of removal after this step.
Inspection
INFOID:0000000003802271
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and any excessive wear at link plates and roller
links of timing chain. Replace timing chain as necessary.
INSPECTION AFTER INSTALLATION
Inspection for Leakage
The following are procedures for checking fluids leak, lubricates leak.
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to
MA-11, "Fluids and Lubricants"
A
: Bank 1
B
: Bank 2
C
: Dowel pin hole
JPBIA1639ZZ
: 44.1 N·m (4.5 kg-m, 33 ft-lb)
PBIC4627J
A
: Crack
B
: Wear
JPBIA0091ZZ
EM-66
< ON-VEHICLE REPAIR >
TIMING CHAIN
• Use procedure below to check for fuel leakage.
- Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
- Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness. Noise
will stop after hydraulic pressure rises.
• Warm up engine thoroughly to check there is no leakage of fuel, or any oil/fluids including engine oil and
engine coolant.
• Bleed air from lines and hoses of applicable lines, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
*: Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
Items
Before starting engine
Engine running
After engine stopped
Engine coolant
Level
Leakage
Level
Engine oil
Level
Leakage
Level
Other oils and fluid*
Level
Leakage
Level
Fuel
Leakage
Leakage
Leakage
ENGINE ASSEMBLY
EM-67
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
REMOVAL AND INSTALLATION
ENGINE ASSEMBLY
Exploded View
INFOID:0000000003802272
Removal and Installation
INFOID:0000000003802273
WARNING:
• Situate the vehicle on a flat and solid surface.
1.
Upper torque rod
2.
Engine mounting insulator (RH)
3.
Engine mounting bracket (RH)
4.
Engine mounting bracket (front)
5.
Engine mounting insulator (front)
6.
Vacuum hose
7.
Vacuum tube (front)
8.
Vacuum hose
9.
Engine mounting insulator (LH)
10.
Vacuum hose
11. Engine mounting insulator (rear)
12. Engine mounting bracket (rear)
13.
Vacuum tube (rear)
14. Gusset
15. Rear torque rod
16.
Rear torque rod bracket
A.
To transaxle
B.
To electronic controlled engine mount
control solenoid valve
C.
VQ25DE
: Vehicle front
Refer to
for symbols in the figure.
JPBIA2195GB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст